Loading…
Loading…
15 live8 closing this weekmost from Roads and Buildings and Energy And Petro Chemicals Department Gujarat
15 results • Best match
Comprehensive Operation and Maintenance of Existing Grid- Connected Rooftop Solar PV Systems having a Total Installed Capacity of 500 kWp at Seven (07) AMC Locations for a Period of Three (03) Years
Providing Grid Connected Solar system at Collector Bungalow at Valsad, Dist.Valsad.
Providing Grid Connected Solar system at Executive Engineer Bungalow at Valsad, Dist.Valsad.
SITC of 80 KWp Roof Top SPV at T. E. Bldg. KR Exchange Rajkot under Gujarat Telecom Circle.
Design Supply Installation Testing & Commissioning of Solar Roof Top plant at Office Building, GIDC, Ankleshwar.
Construction of New LDR Complex Building (Maternity complex with roof Top Solar Facility) at PHC Patlamahu, Ta. Sagbara, Dist Narmada (Deposit Work)
Construction of New LDR Complex Building (Maternity complex with roof Top Solar Facility) at PHC Piplod, Ta. Dediapada, Dist Narmada (Deposit Work)
Design Engineering Supply Erection Testing Commissioning of 20 KWp Rooftop Solar PV Power Project on Various Buildings of KLTPS Plant and KLTPS Colony Premises
Design, Supply, Installation, Testing and Commissioning of AC Solar Roof Top Photovoltaic Power Plant ( Total 300 KW ) including all accessories and 1 Year Comprehensive Operation and Maintenance Contract at Sh Motibhai R Chudhary Sagar Sainik School, Boriyavi
Survey, Design, Supply, Installation, Commission and maintenance of Solar PV System for 5 years as a rooftop at Control Room terrace of various Substation of Navsari and Vapi AM Division as an extension of capacity of existing solar roof top
Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at various Substations under Gotri AM Division under Jambuva Circle under RE R & M plan 2026-27
Design, Supply, Installation, Testing and Commissioning of On Grid Rooftop solar PV power plant
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; as per ATC226; as per ATC226
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; Design Engineering Supply Erection Testing Commissioning and Comprehensive Operation and Maintenance fo..
Design, Engineering, Supply, Erection, Testing, Commissioning and Comprehensive Operation & Maintenance for 5 (Five) Years for 65 KWp Rooftop Solar PV Power Project on GIS Control Room Building of Unit-8, Wanakbori TPS.