Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.6 L
EMD Value
₹8,000
Closing Date
5 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Deputy Executive Engineer Electrical R and B Sub Division PWD Campus Panvadi Bhavnagar
PROVIDING & ERECTING SOLAR ROOFTOP PLANT AT SHAMALDAS ARTS COLLEGE, UNIVERSITY CAMPUS -BHAVNAGAR,TA. & DIST.:- BHAVNAGAR.
367922
E Tender 14 of 2026-27
Open
Electrical Works
Works
Bhavnagar
1 document required · 1 mandatory
₹900
The Executive Engineer, Electrical R&B Division, Bhavnagar
₹8,000
21 Nov 2026
21 Nov 2026
21 Nov 2026
5 Dec 2026
21 Nov 2026
90 days
OF PROVIDING & ERECTING SOLAR ROOFTOP PLANT AT SHAMALDAS ARTS COLLEGE, UNIVERSITY CAMPUS -BHAVNAGAR,TA. &
WORK DIST.:- BHAVNAGAR.
SR NO ITEM QTY. UNIT IN WORDS Amout
1 Supply, Installation, Testing & Commissioning of following size of Grid 18 PER KW 42455.35 Rupees Forty Two
Tied Solar Power Plant with Thousand Four
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum Hundred Fifty Five
alloy Frame With Twin Wall Profile, Front Cover : High Transmission Low- And Paise Thirty
Iron Tempered Glass (AR Coated), High efficency and positive power Five Only
tolerance Pmax: 0/+5, Module Efficiency should be approx. 19.5%-22%,
Normal operating temperature 45'C, Junction Box with Waterproof IP67 &
MC4 Compatible and Enclosed with Bypass diodes, 100%
Electroluminescence test to ensure error free Modules, Thep. temp. co-
efficient of the PV module shall equal or better than -0.45%/degree C.
Solar PV modules of minimum fill factor 75% to be used. Unit Production:-
More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product
warranty. Modules must be complied to the DCR(Domestic content
requirements). The Ration of AC to DC is 5:6 for the Installation capacity
which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency:
97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m) ≤4000,
O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -
25~60°C, Integrated protection of Inverter are Anti-islanding Protection,
Input Reverse Polarity Protection, Insulation Resistor Detection, Ground
fault protection, Residual Current Monitoring Unit, Output Over Current
Protection, Output Short Circuit Protection, Output Over Voltage
Protection, PV array string fault Protection. Protection Degree: IP65, User
Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.
0 Integrated, Input Reverse Polarity Protection Integrated, Insulation
Resistor Detection Integrated, Residual Current Monitoring Unit
Integrated, Output Over Current Protection Integrated, Output Short
Circuit Protection Integrated, Output Over Voltage Protection Integrated,
Protection Degree: IP65, User Interface LCD & APP,Datalogger &
Communication: GPRS / Wi-Fi, Module Mounting Structure: The
mounting (Rectangular pipe / square pipe / circular pipe) with requisite
cross bars, nuts and bolts, etc. shall be Hot deep galvanized with
minimum 80micron coating. The Rectangular / square /circular hollow
pipe section used for the structure should have a minimum thickness of
2.0 mm. other than above, the material thickness should be minimum
mm. A certificate of a structural engineer certifying the strength and
stability of the mounting structure to withstand the weight and wind speed
of 150 km/hour , shall be submitted by the vendors. Hot Dipped
Galvanized steel coils. suitable arrangement for base plate for foundation
, solar panel mounting, the structure should be suitable for carry the load
of solar panel,wiring, sprinkler system etc. with necessary foundation
work/wall mount, j bolt, anchor fastner etc. the nut bolt used for installtion
of stucture should be (SS 304) quality.The ground clearance of the
bottom most edge of solar panel shall not be less than 300 mm to
mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM
Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system as
per the CEIG drawing approval, lightining arrester system as per the
CEIG drawing approval, all liasoning work with various gov. dipartment
like state nodal agency,DISCOM & CEIG is included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity
Charges, Meter connectivity Charges, Meter testing Charges and system
stability/strenthning charges.) (C ) Grid Tied Solar Power System: 11 -
25 kW (3 - phase)
AMOUNT PUT TO TENDER FOR RS.
Rupees Seven Lakh(s) Sixty Four Thousand One Hundred Ninety Six And Paise Thirty Only
(A) Total Tendered Amount Rs..…..……………….…………...…………….
(B) Rebate on above tendered amount (if any)………………..…..%(in Figure) Rs….………………….………………………...
(C) Net tendered amount (A-B) Rs……………………………………………….
All work shall be carried out as per Public Works Department Handbook and other specification of Division or as directed
Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
nivida-14.pdf
tender details SOLAR SAMALDAS.pdf
SCH-A SHAMALDAS.pdf
SCH-B SAMLADAS.pdf
SBD SHAMALDAS COL.pdf
general condition and performa SHAMALDAS.pdf
Additional Instruction (3).pdf
Eligibility Criteria for solar work (1) (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .