Loading
Loading…
Loading…
12 results • Latest
Establishment of FSSM Co-Treatment System Capacity 14 KLD alongwith Existing Sewage Treatment Plant).
SH - Interlinking of parallel line to habitation Bana from storage tank Korga)
Sub Head - Repair of KSB Make Pump Model HAD-50/15, Providing and Fixing 150 HP Starter and PVC Copper Cable
SH - C/O 6 Nos. RCC intake at different locations and laying, jointing and replacement of GI pipe line for Repair and maintenance of distribution system at various RDs)
SH- Supplying and fixing of WASP pump set 10 HP with allied accessories
SH Operation, repair and maintenance of 2.90 MLD capacity Sewage Treatment Plant (STP) with tertiary treatment and sewerage network of Zone-B for three years