Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
463 live141 closing this weekmost from National Highways Authority of India and National Highways Authority Of India
463 results • Latest
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Independent Engineer Services for Development, Operation and Maintenance of the Ropeway Project from Kamakhya Railway Station to Kamakhya Temple on DBFOT Mode in the State of Assam.
Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode.
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)
IE Services for Construction of 6-lane Greenfield Highway starting from its Junction with NH-4B (New NH-348) near Pagote (km.0.000) till its Junction on NH-48 at Chowk (km.29.219) in Maharashtra to be executed on BOT (Toll) mode under NH (O)