Loading…
Loading…
451 results • Latest
Devel. of 6L AC GF Regional Expressway on Northern side of Hyderabad from Girmapur Vill Ch1.518 to Pragnapur Ch.82.000 for a Design Length of 83.518 Km in Telangana under NH O on Hybrid Annuity Mode PKG I
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 77.000 (Near Village Prithvipur) to Km 116.200 (MP/UP Border near Village Barahi) of NH-719 in Madhya Pradesh on Hybrid Annuity Mode (Package2).
Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
CS for IE for the Dev. of 4/6L of access controlled Kanpur Kabrai 0 (Kanpur Ring road) to design km117.700 in UP (Sec1)and Overlay/Strengthening other road safety and imp.works existing Kanpur Kabrai sec.7.430 to 130.100 (0 to 123.860)NH 34 in UP
RFP for the Selection of System Integrator for Design Supply Installation Testing Commissioning and Operation and Maintenance of Vehicle Monitoring Enforcement and Collection System for National Capital Region
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode
Strengthening and Overlay on damaged sections of Six lane Ahmedabad to Vadodara Section of NH 48 (Old NH-8) from Km. 6.400 to Km. 108.700 (Length 102.300 Km) in the State of Gujarat at Risk and Cost of Concessionaire on Single Percentage Item Rate Ba
Widening of Existing 2 laning stretch Road in available width for Safety Drainage Segregation of Traffic in Phaltan City Start Ch. 138 250 at Bypass start point to End Ch. 144 425 and Construction New ROB at Km 179 730 existing Km 61 100 of NH 965
One Time improvement of NH-9 (Rohtak Road) From Punjabi Bagh underpass till Tikri Border in the State of Delhi on EPC Mode
RFP for Selection of Acquirer Bank for FASTag ANPR based Multi Lane Free Flow (MLFF) User Fee Collection at Trans Haryana Expressway (Bundle DL 02) on Fixed Transaction Fee Model
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.86.500 Village Aakli-Kadiya to Ch.159.263 Jhalawar (Junction with NH52) (Package-2) in Madhya Pradesh and Rajasthan EPC NH(O)
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli-Kadiya (Package-1) in Madhya Pradesh on EPC Mode under NH(O)
CS for IE services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on NH NH-67 (Ch.630.960) to Guruvindapudi Village on NH-16 (Ch.739.094) in Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a TL 108.134 km.
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran Bypass near Mannawalla village ch.70.950 (Km 40.900-Km 70.950 Pkg-2) on EPC Mode in Punjab
Strengthening and overlay at various stretches of 4 lane Bamanbore to Garamore Section (km 182.600 to km 254.537) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire
Strengthening and overlay at various stretches of 4 lane Garamore to Samakhiyali Section (km 254.537 to km 306.000) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Reconstruction rehabilitation of existing bridges in Ranchi Rargaon Mahulia sect from km140.000 to 224.800 NH33 new NH43 and km224.800 to 277.568 NH33 new NH18 and existing bridges in Mahulia Baharagora state Jharkhand
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
Construction of Vehicular Underpass VUP at Km 38 280 Kolegaon Pati on Ghogargaon to Ahmednagar Solapur District Border Pkg II Section of NH 561A in the state of Maharashtra on EPC Mode
BW for Cons.of 4lane Greenfield DAKE from Jun. with Jalandhar Kapurthala road (NH703A) near Khojewal village to Junction with Amritsar Mehta Sri Hargobindpur Tanda road (NH503A) (Km 319.400 to 362.420) on EPC mode under NH(O) in Punjab (PKG-11)
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Strengthening overlaying of Four laning of Barhi Hazaribagh section of NH 20 from km 0.000 to km 41.279 (length 41.28 km in the state of Jharkhand on item rate percentage basis
Const. of grade separators at Rabarika Chowkdi Kutiyana Bypass near vill. Mal Choliyana n VUP near Kutiyana vill along with standalone service road 2.20 km on Porbanadar Jetpur sec of NH27 in Gujarat
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
Independent Engineer Services for Development, Operation and Maintenance of the Ropeway Project from Kamakhya Railway Station to Kamakhya Temple on DBFOT Mode in the State of Assam.
Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode.
Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)
Tolling Operation Maintenance and Transfer of Purnea Dalkhola Raiganj section of NH-27 and 12 in the state of Bihar and West Bengal (TOT Bundle-22)
Tolling Operation Maintenance and Transfer of Asanpur- Forbesganj- Purnea section of NH-27 in the state of Bihar (TOT Bundle-21)
Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)