Loading…
Loading…
1,316 results • Latest
Integrated System with AI including MSO H&B 2024, Power Support & Mono Printing equipnment
Construction of RCC covered drain between Ch. 216.500 to 217.795 (LHS) at Ahimamau and Ch. 204.505 to 204.750 (RHS) at Gosaiganj total length of 1.54 km on Sultanpur to Lucknow Section of NH-731
Const. of 4L highway from Barabanki ch. Km 0.000 to Mustafabad ch. Km 43.030 Existing Ch. Km 0.000 to Ch. Km 43.700 on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme PKGI
Construction of 4 Lane highway from Mustfabad Design chainage Km 43.030 to Biswariya Design chainage Km 101.515 (Existing Chainage Km 43.700 to Chainage Km 98.475) on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme (Package-II)
Development of Escape Ramps from Km 830 380 to Km. 830 635 and 833 600 to 833 800 on Pune Satara section of NH 48 in the State of Maharashtra on EPC Mode
Consultancy services for Authority Engineer for Construction of 6 Lane Elevated corridor at Kagal city on NH 48 and Umbraj on NH 48 under NH(O) in the State of Maharashtra on EPC Mode.
CS for AE for Supervision of balance work for rehabilitation and upgradation of Sidhi Singrauli Road from Km 82/400 to Km 187/99 DL 105.59 Km of NH39 (Old NH75E) to four lanes with paved shoulder in Madhya Pradesh on Item Rate Mode
Engagement of user fee agency through e quotation for Belsar FP at km 202.225 of Lonand (design km 166.400) to Dive Ghat (design km 220.900) Design Length 54.500 km) of Mohol Alandi section (PKG-V) of NH-965 in Maharashtra
Short Term repair and maintenance of A JNPT Package 1 B JNPT Package 2 Gavanphata Interchange C JNPT Package D JNPT Package 4 in the State of Maharashtra on item rate percentage basis
CS for AE of Const. of 4L South East Bypass for Azamgarh City connecting NH28 at exist Ch. Km 218.800 to Purvanchal Expressway at exist Ch. Km 247.850 TL 14.905 Km in UP on EPC Mode
Operation and Maintenance of facilities / amenities at Taroda-Kasaba Toll Plaza (Km. 280.400) on both sides (LHS and RHS) under Highway Nest (Mini) including toilets on Amravati - Chikhali section of NH-53 from km 270.000 to km 315.000 (2nd Call)
Strengthening Road Safety works Including improvement and Routine Operation Maintenance of Delhi-Gurgaon NH-48 Other works along the project highway 14.300 to Km. 42.000 (Delhi to Kherki Dhaula FPin Haryana) in Delhi Haryana 2nd call
Hiring Office Premises for Maharashtra MMLP Private Limited (3rd Call)
Operation and Maintenance work for 4 6 laned Vadape Gonde Km 440 000 to Km 537 000 section of NH 3 Except Length under HAM Concessionaire for Six Laning Work from Gonde to Pimpri-Sado in the state of Maharashtra
Design and Re Construction of Major Bridge at Mula River including approaches at Km 853 556 LHS MCW and Superstructure of VUP at KM 862 180 BHS of Pune Satara Section of NH 48 in the State of Maharashtra on EPC Mode
Permanent Rectification of Black Spots TN-(05)-077, TN-(05)-078, TN-(05)-076, TN-(05)-075 in Salem to Ulundurpet section of NH-79 in the State of Tamil Nadu on EPC mode - 2nd Call
Permanent Rectification of Black Spots TN-(05)-848, TN-(05)-849, TN-(06)-110, TN-(06)-089, TN-(06)-091 in Salem to Ulundurpet Section of NH-79 in the State of Tamil Nadu on EPC Mode - 2nd Call
Permanent Rectification of Black Spots TN-(05)-050, TN-(05)-191, TN-(02)-091 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
Permanent Rectification of Black Spots TN-(05)-037, TN-(02)-175, TN-(05)-040, TN-(02)-169 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
All in One PC (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Construction of Entry-Exit Ramps at ROB km 9.996 on Jind Bypass for rectification of MoRTH Blackspot on EPC Mode in the State of Haryana.
Strengthening/ Bituminous overlay work and Routine maintenace including incident management of Dogal Kalan to PB/ HR Border Section of NH-52 from km 211.390 to km 238.695 of in the State of Punjab
Strengthening/ Bituminous overlay work and Routine maintenance including incident management of Sangrur to Dogal Kalan Section of NH-52 from km.181.805 to km 211.390 of in the State of Punjab.
4-laning of Ambala-Chandigarh Section (i) from km. 5.735 to km. 39.960 of NH-22 and (ii) from km. 0.000 to km. 0.871 of NH-21 in the State of Haryana and Punjab on BOT - Installation of Pedestrian Guard Rail (PGR) at median from Ch. 33.970 to 37.200)
Operation and Maintenance including Incident Management Services for 4-6 Lane of Tallewal-Barnala Section of NH-703 from Km 116.600 to 146.240 in the State of Punjab (2nd Call).
EMPANELMENT OF ADVERTISING AGENCIES FOR NHAI, REGIONAL OFFICE, KERALA
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7
Engagement of user fee collection agency on the basis of EQ through etender at Reddypalem Toll Plaza in Andhra Pradesh and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee agency through EQ for Baiji FP at Km.285.012 of NH30 section of NH-12A New NH130 in Chhattisgarh
Add on Phones/Consols/Endpoint for PABX System (Q2)
RFP for Independent Engineer Services during Operation and Maintenance of the stretch Tolling Operation Maintenance and Transfer of Kota Bypass from Km.1052.429 to Km.1080.249 of NH-27 including Cable Stayed Bridge (TOT-13) in Rajasthan-(3rd Call)
Internet Bandwidth and Replication Service - Internet Leased Line; Goverment Service provider; Class A; Unified; 200
Consultancy Services for Supervision Consultant for Four laned Rohtak to Panipat section of NH-709 (Old NH-71A) from km. 0.000 to km. 80.858 in the state of Haryana executed on DBFOT mode (Terminated).
Operation and Maintenance of 4 Laning of Kutchery chowk Ranchi Piska More Bijupara Kuru Section of NH75 (from Km.3.560 to Km. 55.000) and Piska More Palma Section of NH23 (from Km.3.600 to Km.26.000) (Length of 72.67 Km) in Jharkhand on PBMC mode
Custom Bid for Services - Hiring of commercial vehicles for office use of NHAI, PIU- Mysuru Similar Category Monthly Basis Cab & Taxi Hiring Services
Engagement of user fee agency through ETender at Jiwana Fee Plaza in the State of UP and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency on the basis of CB through e-tender at Bandapalli fee plaza at km 119.945 for the section from Rayachoty to Kadapa Section from design kilometer 108.850 to kilometer 160.130 in Andhra Pradesh
ngagement of user fee agency on the basis of CB at Keezhkuppam Fee Plaza in the State of Tamil Nadu and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee agency through EQ for Labhera FP at km 322.600 for the use of 4 and more lane sec of Sitarganj Bareilly Sec of National Highway number 74 New NH30 in Uttar Pradesh
Construction of RCC Drains at several locations in Chhapra -Rewaghat -Muzaffarpur section of NH 722 in the state of Bihar.
Authority Engineer Services for Construction of VUP at Km 26.100 (Village Khalal) and Upgradation of Ahmedabad Godhra NH-47 from Km 60.000 to Km 105.000 on EPC Mode.
Repair of service road, Construction of RE wall, slope protection work, Earth filling work (Weight bridge) and Safety work for Approaches to Rail - cum -Road Bridge across River Ganga at Munger Ghat near Munger of NH-333B in state of Bihar (2nd Call
Construction of 2 nos. Foot Over Bridges (FOBs) on Standalone basis at Km. 45.240 Km. 54.640 on Galgalia-Araria section of NH- 327E in the state of Bihar on EPC mode
JK Max 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain, JK Max 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Engagement of user fee collection agency on the basis of CB through etender at Durgamvaripalli FP at Km 69.015 for the sec of NH-18 in Andhra
Engagement of user fee collection agency on the basis of CB through etender at Kuchadi FP at 409.500 and Okhamadi FP in the state of Gujarat and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
CS for AE for Cons. of 6 Lane Elevated corridor from 612.582 to KM 617.540 including cons. of dedicated flyover towards Kolhapur City on NH 48 in Flood Affected Zone of Kolhapur (Descoped work of Kagal Satara PKG1). 2nd level Ramp(0.000-1.263) in MH
Operations and Maintenance of Four lane Parwanoo-Solan Section of NH-22 (Now NH-05) from Km. 67.000 to Km. 106.139 in the state of Himachal Pradesh on Performance based Maintenance Contracts (PBMC)
KRISHANA INDIAN--KRISHANA INDIAN Cardboard / Duplex Board Office, KRISHANA INDIAN--KRISHANA INDIAN Cardboard / Duplex Board Office File Board for 21.5 cm × 35.5 cm (Legal) size document