Loading…
Loading…
1,317 results • Latest
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; Toyota Innova Crysta; 2025; 0-25, 000 kms; A/C; 12, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Sedan; Maruti Suzuki Dzire; 2025; 0-25, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; 2025; 0-25
RFP for Selection of Acquirer Bank for FASTag-ANPR based Multi Lane Free Flow (MLFF) User Fee Collection at Madanpur Fee Plaza on Fixed Transaction Fee Model
One Time Improvement with White Topping on existing carriageway in Shirur Tajband on NH-361 in the State of Maharashtra on EPC mode
Construction of 6 lane flyover for Long Term Rectification of the Blackspot ID-MH-(06)-167 at Kohmara Junction from km 436.036 to km 437.895 on Wainganga Bridge to CH/MH border section of NH-53 in the state of Maharashtra on EPC mode
Construction of 6 lane flyover for Long Term Safety measures at Chichgadh from Ch. 412.405 to Ch. 414.605 on Wainganga Bridge to CH/MH border section of NH-53 on EPC mode in the state of Maharashtra on EPC mode under RO-NAGPUR.
Construction of Four Lane VUP at Km. 649.617 including Service Road and Drains at Hanuman Tekari and other miscellaneous work on Abu road- Swaroopganj Section of NH-27 in the state of Rajasthan on EPC mode
Strengthening and Construction of existing 4-Laned Internal Road to Chalisgaon Town (Length 3.90 km) Section of NH-52 under One Time Improvement Scheme in the State of Maharashtra on EPC Mode
Strengthening of existing Raver Town to MH/MP Border portion in a length of 11.100 km from km 220.100 to km 231.200 on NH-753BE in the State of Maharashtra on EPC Mode
Strengthening of existing Vivre Village to Raver town portion in a length of 11.000 km from km 209.100 to km 220.100 on NH 753BE in the State of Maharashtra on EPC Mode
Strengthening of existing Faizpur to Savda town portion in a length of 14.230 km from km 189.240 to km 204.500 on NH 753BE in the State of Maharashtra on EPC Mode
Strengthening ans Improvement of Gorakhpur Kasia UP Bihar Section of NH27
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
Construction of the Icchak Flyover (with service road in partial length) at km 24.500-26.300 and Slip Road at Hazaribagh bypass from km 33.690-34.945 (LHS) and km 33.515-34.945 (RHS) section of Barhi-Hazaribagh 0.000-40.500 of NH-33 in Jharkhand
Widening of exis 2L to 4L divided carriageway with PS from Km243.800 to Km270.500 of NH 39(Rewa to Churhat Tunnel North portal excluding Churhat Tunnel)and from Km286.200 to Km 313.700 of NH39(Churhat to Sidhi sec)L-54.20 Km under NH(O) in MP on HAM
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Const. of 6 lane Zirakpur Bypass Starting from Junc. with NH7 Zirakpur Patiala DC 0.000 and ending at Junc. with NH5 Zirakpur Parwanoo DC 16.800 TL 19.200 Km in Punjab and Haryana under NH(O) on HAM
SITC for Backbone switch and workgroup switch (Core and Access)
IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch.0.000 to Garhani (at SH-12) at Ch74.432 package-1 of Patna Arrah sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call)
Construction of Six Lane Greenfield Patna Ring Road Highway (NH131G) from Kanhauli to Sherpur (from Km. 0.000 to Km 8.480) including Junction Development with Bihta Danapur elevated corridor (length1.5 Km) (TL 9.98 Km.) in Bihar.
Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode
Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode
Const. of 6L AC Spur connectivity start. Ch. 15.100 of Ambala Chandigarh sec of NH205 A and terminating at Ch. 2.500 of Zirakpur Bypass TL 10.300 Km under NH(O) in Punjab on Hybrid Annuity Mode.
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
Strengthening and Road Safety Measures work of Shiroli Ankali Section from Km 146 790 to Km 182 250 NH 166 in the state of Maharashtra on item rate percentage basis
Strengthening and Overlay of Jhalawar Rajasthan and M.P Border Section of New NH 52 from (New Km 355.500 to Km 416.700) (Old Km 346.540 to Km 408.700) in the State of Rajasthan on item rate (percentage) basis
One Time Improvement work of Bypassed section of Old NH 543 in District of Balaghat and Gondia Start Point in Balaghat District in Avanti Bai Chowk
Rehabilitation and Strengthening of Existing Service Road and new Service Roads RCC Drains along with Overlay on Main Carriageway and other ancillary works on Surat-Vapi section (from Km 263.00-Km381.00) of NH-48 in Gujarat on Item Rate Percentage
Construction of VUPs for rectification of MoRTH identified Blackspots at Sikandra and Chhokarwada on Jaipur Mahua Bharatpur section of NH 21 in the State of Rajasthan
Construction of High-level Bridge and its approaches in place of existing Low-level Bridge at Km 466.310 on Penchalakona to Yerpadu section of NH-565 with Two Lane Paved Shoulder configuration in the State of AP on EPC mode.
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
4 laning of NH 167 from Gudebellur at Design Km 182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on Hybrid Annuity Mode (HAM) in the state of Telangana
a4paperwhite, a3paperwhite, boxfile, fevistick, scale, cutter, caluculator, calling bell, gemclips, cellotape2inch, cellotape1inch, cello tape2inch, scissor, ballpenblue, pencilhb, staplerpin, permanentmarkerpen, cdmarkerblue, stapler, staplerno10, 4sideclosegfolder, tagsredbig, highlighteryellow, longnotebook200pages, lfolderlegal, stickfile, executivebondpaper, telephoneinstrument, binderclips, notepadspril100 p, postitpad4colour, stockregister, postitpad1colour, cell, garbagecoverbig, roomfreshener, phenols5ltr, handwashliquid250ml, harpic500ml, lizal500ml, colinspry500ml, vimbar, mopstick, pacetissuepaperbox, tissuepapernormal
Consultancy Services for Preparation of Detailed Project Report (DPR) of 4-laning of Jabalpur-Mandla-Chilpi section of NH-30 in the State of Madhya Pradesh
Custom Bid for Services - Hiring of One commercial vehicle (Innova or Equivalent) on monthly rental basis for office use of NHAI, PIU-Bagalkot Karnataka Similar Category Monthly Basis Cab & Taxi Hiring Services
Operation and Maintenance of Highway mini nest
Construction of 6 Lane Elevated corridor from KM 698.600 to KM 699.900 section of NH48 including construction of slip roads service roads in Umbraj City. (Descoped work of Kagal Satara Package2) in the state of Maharashtra on EPC Mode.
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
CS for Prep. of DPR for Upgrad. of exist. road connect NH 548A n NH753F from 2L to 6L till NH66 to both sides Agardanda side n Dighi Side b Bridge over creek near Waral connecting both Terminal Access road in Maharashtra
Construction of additional safety measures on Acchad Dahisar (Km 381.000 to Km 502.000) section of NH48 in the State of Maharashtra on EPC mode
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur Vishakhapatnam Corridor in the State of Chhattisgarh
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Rameswar (NH16) to Gobindpur Package II from Design Ch. Km. 40.700 to Km. 70.995 in the State of Odisha under NH(O) on Hybrid Annuity Mode.
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km. 0.000 to Km. 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1)
Construction of Minor Bridge at Km.419.285 and Construction of Box Culverts at Km.354.872 and Km.354.892 towards Flood Damage repairs on Nagpur-Hyderabad section of NH-44 in the State of Telangana on EPC Mode.
Const. of Double loop dumbbell Interchange at the Junc. of NH52 HR n RJ Border Barwala and NH9 Delhi Sirsa at Dhandhoor in Haryana as part of Amritsar Kolkata Industrial Corridor under NH O on EPC mode
Installation of Pedestrian Guard Rail Kerb and kerb painting at unauthorized median opening in Angul to Sambalpur section of NH 55 3rd Call
Construction of Six Lane Grade Separated Structure near Chintareddypalem Junction (at Km.1374.945) on Nellore Bypass section of NH-16 (Old NH-5) in the state of Andhra Pradesh on Engineering, Procurement and Construction (EPC) Mode.
Cons. of Long Term Remedial measures of River cut/bank erosion at identified 12 locations (i.e. RC-18 A-RC-22 RC-20 A-RC-25 A-RC-26 A-RC-24 A-RC-19 A-RC-20 and A-RC-21 RC-21 RC-23 RC-25) KULLU TO MANALI on K-M Sec. of NH03 (OldNH21) in HP on EPC
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.