Loading…
Loading…
1,317 results • Latest
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Construction of a 4lane byp. from Thekma village(km36.300) to Gosai Bazar Byp.(km242.500) with 8.135km along with widen. from 2-4Lane from Smt. LM Jun. to PI for a length 4.70km and Streng. of NH-128A from PI-Moha Jun. 41.35km(54.185km) in UP on EPC
Removal of At-grade junctions at Panchganga Chowk in the Mohol-Wakhari section and at 61 Phata Malshiras in the Khudus-Dharampuri section of NH-965 in the State of Maharashtra on EPC mode
Monthly Basis Cab & Taxi Hiring Services - SUV; 4000; Local 24*7
Strengthening Overlaying of the Aligarh-Palwal Section of NH-334D from Existing Km. 4.450 to Existing Km. 7.400 in the State of Haryana on Item Rate (percentage) basis
Strengthening under One Time Improvement of bypassed realigned sections of Kurnool to Mandlem to Atmakur section of NH340C in Andhra Pradesh on item rate percentage basis
Construction of 1 nos of underpass at Lakhavali Junction on Swaroopganj Pindwara Udaipur section of new NH 27 in the State of Rajasthan on Engineering, Procurement and Construction (EPC) Mode
Strengthening-rehabilitation of rigid and flexible pavement with flexible overlay (50.93 km) and reconstruction (13.33 km) along with 04 years routine maintenance of Bhopal-Biaora section from Km.324 to Km.394.923 of NH-46 in MP on Item Rate Basis
Profile raising and strengthening of existing flexible pavement including flexible overlay (2.12 km) and reconstruction (22.817 km) along with 04years routine maintenance of Bhopal-Biaora section from Km.394.923-Km.421.450 of NH-46 in MP on Item Rate
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Balance work of new bridge on Gandak river including approaches and rehabilitation of the existing Gandak bridge at km 206.436 of Chhapra- Hajipur section of NH-19 in the state of Bihar on EPC mode
Construction of Underpasses VUP LVUP SVUP for long term mitigation measures on MoRTH identified blackspots and other Potential Blackspot locations in Lakhnadon section of NH 34 and Sleemnabad to Lakhnadon Section of NH30 on EPC Mode.
Strengthening of existing Yawal town portion in a length of 6.500 km from km 174.100 to km 180.600 on NH 753BE in the State of Maharashtra on EPC Mode under RO Nagpur
Rectification of MORTH identified Blackspots (07 Nos.) on existing 6 lane Chilakaluripeta to Nellore section of NH-16 from Km. 1182.802 to Km. 1366.547 in the state of Andhra Pradesh on EPC Mode (Package-II)
Strengthening and Major repair of Chunchuluru - Nellore Section from Km.652.200 to Km.738.520 (Length 86.320 Km) of NH-67 in the State of Andhra Pradesh
Strengthening of Service Roads with White Topping from Km 112.500 to Km 113.805, Km 132.030 to Km 134.080 and Km 169.200 to Km 170.270 (BHS) and Construction of New Service Road from Km 81.882 to Km 82.182 (RHS) on NH-44 in the State of Maharashtra