Loading…
Loading…
757 results • Recent activity
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode
Four lane with paved shoulders from Budhel Junc. to Vartej Completion period 1.5 Years Maintenance period 5 Years Y junc. Km 0.900 to Km 9.400 on EPC mode under NH (O) in Gujarat
Periodic Renewal of Nellore Bypass section from km.1366.547 to km.1383.713 excluding the sections from km 1379.340 to km1380.350 km 1382.690 to km 1383.713 and Major bridge (Penna bridge) NH-16 in the state of Andhra Pradesh.
Consultancy Services for Preparation of DPR for 6-lane Road from Harsaru bypass of Gurugram Pataudi road at Wazirpur (NH352W) to Jhajjar (NH-352) including construction of Farrukhnagar Bypass (Approx. Length 33 KM)