Loading…
Loading…
758 results • Recent activity
Widening and Improvement of exist carriageway to 4L of Kaliabor Numaligarh sec Ch.315.315 to km. 400.990 of NH37 New NH715 includ. Implementation of Wildlife-friendly Measures Proposed on KNP Stretch in Assam on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Construction of a 4lane byp. from Thekma village(km36.300) to Gosai Bazar Byp.(km242.500) with 8.135km along with widen. from 2-4Lane from Smt. LM Jun. to PI for a length 4.70km and Streng. of NH-128A from PI-Moha Jun. 41.35km(54.185km) in UP on EPC
Construction of the Icchak Flyover (with service road in partial length) at km 24.500-26.300 and Slip Road at Hazaribagh bypass from km 33.690-34.945 (LHS) and km 33.515-34.945 (RHS) section of Barhi-Hazaribagh 0.000-40.500 of NH-33 in Jharkhand