Loading…
Loading…
757 results • Recent activity
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
Construction of additional safety measures on Acchad Dahisar (Km 381.000 to Km 502.000) section of NH48 in the State of Maharashtra on EPC mode
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur Vishakhapatnam Corridor in the State of Chhattisgarh
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Rameswar (NH16) to Gobindpur Package II from Design Ch. Km. 40.700 to Km. 70.995 in the State of Odisha under NH(O) on Hybrid Annuity Mode.
IE Services for Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km. 0.000 to Km. 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1)