Loading…
Loading…
757 results • Recent activity
Construction of 6 lane flyover for Long Term Rectification of the Blackspot ID-MH-(06)-167 at Kohmara Junction from km 436.036 to km 437.895 on Wainganga Bridge to CH/MH border section of NH-53 in the state of Maharashtra on EPC mode
Construction of VUP/VOP at (i) Swami Chincholi (Ch. 97.370.000) (ii) Dalaj (Ch. 109.985) on Pune-Solapur (NH 65) from km. 40.000 to km.150.050 in the state of Maharashtra on EPC mode.
Construction of 6 Lane Elevated corridor from KM 698.600 to KM 699.900 section of NH48 including construction of slip roads service roads in Umbraj City. (Descoped work of Kagal Satara Package2) in the state of Maharashtra on EPC Mode.
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
CS for Prep. of DPR for Upgrad. of exist. road connect NH 548A n NH753F from 2L to 6L till NH66 to both sides Agardanda side n Dighi Side b Bridge over creek near Waral connecting both Terminal Access road in Maharashtra
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.