Loading…
Loading…
757 results • Recent activity
Construction of Six Lane Greenfield Patna Ring Road Highway (NH131G) from Kanhauli to Sherpur (from Km. 0.000 to Km 8.480) including Junction Development with Bihta Danapur elevated corridor (length1.5 Km) (TL 9.98 Km.) in Bihar.
Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode
Routine Maintenance (including overlay on the required staggered stretches) and Incident Management of 2 Lane plus PS configured Jhajjar-Loharu Section of NH-334B from Km 0.000 to Km 97.864 for 1 Year.
Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode
Const. of 6L AC Spur connectivity start. Ch. 15.100 of Ambala Chandigarh sec of NH205 A and terminating at Ch. 2.500 of Zirakpur Bypass TL 10.300 Km under NH(O) in Punjab on Hybrid Annuity Mode.
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode