Loading…
Loading…
757 results • Recent activity
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Upgradation Strengt. of Exi. 2-4 Lane Carriageway to 4Lane from Ch.132.32 (Km.454.5) in Dhamasiya Village in Naswade Taluka to Ch.179.78 (Km.506.66) in Bitada-Movi Village in Netrang Taluka (TL47.46 Km) Section of NH-56 in Gujarat on HAM (Pkg-IV)
Upgradation of Existing Two Lane Carriageway to Four Lane from Ch 208.90 (Km 535.93) in Nasarpore Village in Umarpada Taluka to Ch 269.11 (Km 608.51) in Malotha Village in Vyara Taluka (L60.21 Km) section of NH-56 in Gujarat on HAM (Pkg-VI)
Const. of 6 lane Zirakpur Bypass Starting from Junc. with NH7 Zirakpur Patiala DC 0.000 and ending at Junc. with NH5 Zirakpur Parwanoo DC 16.800 TL 19.200 Km in Punjab and Haryana under NH(O) on HAM
IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch.0.000 to Garhani (at SH-12) at Ch74.432 package-1 of Patna Arrah sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call)
4 laning of NH 167 from Gudebellur at Design Km 182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on Hybrid Annuity Mode (HAM) in the state of Telangana