Loading…
Loading…
758 results • Recent activity
Upgradation of existing highway to 2-lane with paved shoulders standard from Parsarma to Araria Section of NH-327E on Hybrid Annuity Mode in the state of Bihar
Improvement and Rectification Works at 5 Nos. of MoRTH-identified Black Spot Locations through long term measures on Lucknow Kanpur Section of Old NH-25 (New NH-27) (Km 27.700 to Km 75.500) in the State of Uttar Pradesh.
High End Desktop Computer (Q2), Multifunction Printer (Print, Scan, Copy) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Upgradation and Strengthening of Kamrej Chalthan Section of NH 48 from Km 249.00 to Km 262.875 to 6 Lane Divided Carriageway with Service Road on Both Sides (Length 13.875 Km) in Gujarat on EPC mode
Strengthening of Service Roads with White Topping from Km 112.500 to Km 113.805, Km 132.030 to Km 134.080 and Km 169.200 to Km 170.270 (BHS) and Construction of New Service Road from Km 81.882 to Km 82.182 (RHS) on NH-44 in the State of Maharashtra
Strengthening of Service Roads with rigid pavement on Wardha Butibori Section and Construction of Foot Over Bridge at km 446.085 at village Bhidi on Yavatmal to Warda Section of NH-361 in the State of Maharashtra on EPC mode