Loading…
Loading…
758 results • Recent activity
Construction of VUP (Ch. Km 149.280) at Pandharkawada Y-Junction on Nagpur to Hyderabad Section of NH-44 in the State of Maharashtra under EPC Mode
Providing Highway Lighting and Road Safety Measures at 20 no. of locations in the Four lane rigid pavement with paved shoulder stretch of NH-69 (Old NH-4) from Km 172.000 to Km 219.687 of Nalagampalli to Alkuppam (AP/KA Border) in the State of AP
One Time Improvement of bypassed/ realignment (existing road portion) locations (16 Nos. in a length of 27.255 Km) of Renigunta to Naidupeta section of NH-71 in the State of Andhra Pradesh.
Routine Maintenance including Incident Management of Badvel to Nellore Section from Km 628.555 to Km 741.950 of NH-67 in the state of Andhra Pradesh
RFP for Selection of Acquirer Bank for FASTag-ANPR based Multi Lane Free Flow (MLFF) User Fee Collection at Madanpur Fee Plaza on Fixed Transaction Fee Model
Widening of exis 2L to 4L divided carriageway with PS from Km243.800 to Km270.500 of NH 39(Rewa to Churhat Tunnel North portal excluding Churhat Tunnel)and from Km286.200 to Km 313.700 of NH39(Churhat to Sidhi sec)L-54.20 Km under NH(O) in MP on HAM