Loading…
Loading…
11 results • Latest
Supply, Installation, and Integration of Energy Management System for Electrical Infrastructure at NITC Phase-1
WIRING
Electrical works at New CSED Laboratory - Second Floor of CCC Building
Laying and Jointing PVC Pipe. Heading
Relocation of existing LED flood light High mast in front of Main building to East Campus
Dismantling the existing 12m high mast pole with floodlights and the control panel from the installed position, loading, transporting to the new location and unloading without damage; installation, testing and commissioning at the new location, including providing a new suitable foundation as per the manufactures design,(annexxure 1).Installation includes the supply of foundation bolts manufactured from special steel along with nuts, washers, anchor plates and templates and casting of suitable shallow foundation with reinforcement, 1:2:4 concrete for the high mast considering the safe soil bearing capacity at site as 10 T/sq mtr at 2 metre depth with all materials and labour, as per the drawing.The High Mast shall be erected with the help of suitable equipments and re wiring of luminaires with all wiring materials and labour etc as required.(The cost includes all the required activities like earth work,Dismantling/removing of RCC/PCC/RR or any masonary structure to take out the light pole,dismantling of bolts,nuts etc.centering/supporting arrangements refilling and make god the ground etc as per EIC direction.Reusable materials shall be returned to stores).Site visit recommended.
Mounting Floodlights at Basketball Court
Supply of 350watts,LED flood light fitting of powder coated pressure die-cast aluminium housing,frame with heat resistant toughened clear glass and high power LEDs and secondary lenses with IP66 protection,System efficacy>=135 Lum/watt ,with 10KV SPD.(Philips/Crompton/Bajaj/Havells Equivalent )
Electrical Renovation of Concrete Lab
WIRING
Providing Steel Mosquito Nets For The Windows In MBA Hostel A,B Blocks And Guest Rooms
ALUMINIUM WORK