Loading…
Loading…
1,376 results • Latest
M/o Road (Beautification and Painting of Rajnigandha Underpass and P/F Polycarbonate sheets at Shahdara Drain on M.P.-1 Road), Noida
M/o Drain (C/o RCC Drain on 30.00M wide road parallel to Yamuna Pusta from Junior High School Asgarpur to Village Ghari Shahpur Cut (pusta side) in Sector-128) Noida
D/o Village (P/F Reflective Signage Boards in Village Internal Gali in Village Raipur) Noida.
Supply and Installation of Decorative Pole for Beautification in Noida Staduim Sector-21A Noida
P/L Thermoplastic paint on Udyog marg Sector-14A Flyover to Sector-11 T-Point, Noida.
M/o Road (M/o Footpath, Central Verge and Repair of Tiles 45.00 and 30.00 Mtr Wide Roads in Sector-135) Noida
M/o Stadium (C/o Rain Basera in Ramlila Ground preparing temporary Chhath Ghat in Noida Stadium Ramlila Ground and supply of fuel wood and burning for Alao at different location in Work Circle-2 Area) Noida
D/o village (C/o Boundary wall of Vacant Plot near Nayagaon Baratghar, village Nayagaon and back side of Barat Ghar, Illabans) Noida
Strengthening of Sewerage (Construction of sump well at 5 percent abadi plots area in Sector-145 for sewer disposal of Sector -145, 144 5 percent area and sector-144 partially and P/L laying Rising main line Sump well to IPS-1 Expressway) Noida.
Strengthening of Sewerage (Changing of old chocked and damaged sewer line in different blocks at Network Sector-30, 31 and 36), Noida.
Providing street light and High Mast Lighting System in Sector-140 and Sector-140A, Noida.
Strengthening of Road (P/L DBM and BC Between Sector-44 and 43 Mid Road and Sector-96 and 97 Mid Road) Noida
Development Sector-116 (C/o Kitchen and other Maintenance work in Community Center Sector-116), Noida
D/o Village (C/o Store room, kitchen, construction and raising of boundary wall, coil fencing, Paver Block in Parking area and other maintenance work Community center village-Yakubpur), Noida
M/o Drain (M/o Drain and C/o Culvert in Block-A and B Hosiery complex) Noida
M/o Road (Construction of Model Road from J.P. Flyover to DSC Road) Noida
Strengthening of Road (Cold Mling and P/L DBM and BC on Internal Roads in Sector-56), Noida
M/o Park (Reconstruction of Footpath and C/o Bench Platform in A Block Park Sector-100) Noida
M/o Park/Green Belt with two year Maintenance Sector-121 and 123 Noida
M/o Park/Green Belt (Annual Civil Maintenance work in all parks and green belt of Sector-34 and 61) Noida.
M/o Park/Green Belt with two year Maintenance Sector-11 and 12 park and Green Belts and RSP Central Verge Rastriy Sahara Road and Triangulars, Sector-11 and 12 Noida
Construction of 33/11 KV Sub-Station in Sector-121, Noida
M/o Road (Repair of footpath infront Cleo County, Homes 121 and Tikona Park in Sector-121) Noida
Development of Village (P/L CC, RMC, B/W and Other misc work from mini Stadium to Munder Yadav, Radhay Lal Sharma to Mahinder Yadav, Pandit Colony and Other adjoining streets in Village Sarfabad), Noida
M/o Building (Repair of External/Internal Staff Quarter in Pocket B-1, B-3, B-5, B-10, B-10A, B-12A, B-14, and Neel Giri-I in Sector-34) Noida
Strengthening of Road (P/L B.C. on Main Carriageway on Kondli Road from Sector-57, 55, 54, 22 Xing to Dhawalgiri Appt. Sector-11) Noida
M/o Sewerage (Two year cleaning of Internal Sewer line by Portable Re-Cycle Jetting Machine in Village-Nagla Nagli, Nagli Sakhpur, Rohillapur and Sector-130 and 132) Noida (Total 3 Villages Cleaning work for Two Year)
Village Development and Maintenance (Construction of R.C.C. Under Ground Reservoir capacity of 1500 KL in Village-Bishanpura) Noida
O/M of Sewer line and MSPS/SPS at Expressway (Two Year Repairing of Transformer and Diesel Generator Set with other related Electrical works at IPS-5,6,7,8 and MSPS-2 along N.G.N. Expressway) Noida
D/o Sector-94 and 94A (C/o Cremation Platform, Shed and renovate of wooden storage hall and other maintenance work in Antim Niwas Sector-94A) Noida
M/o Road (Construction of RCC Footpath Chora More Crossing to Sector-56,12 and 22 T-Point on M.P.-1 Road), Noida
Supply of Wheat Bhusa in temporary Gauvansh Ashray Sthal, Vill- Nagli Wajidpur, Sec-135, Noida.
M/o Road (Repair Of Footpath, Refixing of Interlocking tile and Repair of central verge on 45M wide Road parallel to Pusta Sector-127 to 128) Noida
M/o Drain (C/o R.C.C Drain between Sector-133 and 134 parallel to 45.00M wide road from petrol pump to Sector-132, 133 T-Point and Covering of Drain from Petrol Pump, J.P. Cosmos Side) Noida
M/o Park/Green Belt (Annual Civil Maintenance Work in Under Horticulture Division-I Yamuna river front YRF) Noida.
Strengthening of road (Resurfacing of 45.00M wide road between Sec-124 and 125) Noida
M/o W/s (Two Years Maintenance, Repairing of C.I./D.I., M.S. and PVC Water line and R/o Sluice Valve, Reflex Valve and Chamber in Network Sector-57 to 60 and Village-Bishanpura, Mamura, 5 Percent Abadi Sector-66) Noida
D/O Village (M/o Street Light and Installation of New Lights in Some Streets and Internal Electrification in Panchayat Ghar, Barat Ghar , Govt. Primary School, Junior High School in Village - Salarpur, Bhangel and Nagla Charandas), Noida.
Emergency Work (Fencing with RCC post vacant noida land for safety of land of different village and Sector of work Circle-9) Noida
Strengthening of Roads (Resurfacing Work on Internal 30.00M Wide Road in Sector-132) Noida
M/o Roads (Repair of Pot Holes in Various Sector of Work Circle-7 area) Noida
Development Sector -137 (Construction of Community Center in Sector-137) Noida
D/o village (C/o C.C. Road and Drain in village Illabans) Noida
M/o Road (Upgradation and Improvement at Main roads and internal roads for Safety and Signage work in Work Circle-7 area) Noida
Cleaning and Desilting taking debris, silt for culvert in Sector-42, 47,50,99,75 mtr road between 50 and 51 road, between 47-48 and 42-46 road, vodamahadev road and NRI road by super sucker machine), (cieaning of coverd and culvert with super sucker
M/o Park (C/o Chhathghat in Wetland Park Sector-91 ) NOIDA.
M/o Green Belt (Reconstruction of Damaged Boundary Wall, C/o Kaccha Footpath, C/o Gazebo Hut and Other Civil work in Green Belt Sector-143) Noida.
M/o Green Belt (Beautification) C-Block Sector-62 with two year Maintenance Noida
Master Green with two-year Maintenance in front of Pan Oasis Society Sector-70 Noida
M/o RSP wiith 02-year Maintenance FNG Road, Village Chijarasi to Parthala Gol Chakkar, Central Verge, Both side Noida