Loading…
Loading…
379 results • Latest
Engagement of user fee agency through EQ for Gharunda Fee Plaza in the state of Haryana and Punjab and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items
Rectification of defects and deficiencies in Road Safety Measures and pavement distresses, at the risk and cost of the PBMC contractor, for the Chilakaluripet-Vijayawada section of NH-16 Length 68.204 km on an Item Rate basis in the State of AP.
Construction of Major Bridge with Approaches as per IRC-MoRTH Standards at Km. 127.630 of Aligarh-Moradabad section of NH-93 (New NH-509) in the State of Uttar Pradesh on EPC Mode
Construction of Km. 85.480 and its approaches in Duburi Brahmanipal section of NH 720 over proposed canal crossing at RD 104.130 Km of Rengali left bank canal under RIP Phase II Deposit work in the state of Odisha on EPC Mode 2nd Call
Operation and Maintenance estimate of Punjab/Haryana Border Jind section of NH 52/352 (Old NH 71) from Km 238.695 to Km 292.712 and Km 0.000 to Km 16.191 (Total Length 70.178 km) in Haryana for a period of 5 years on (PBMC) mode
Operation and Maintenance of Jharpokharia-Baripada-Baleswar Section of NH-18 (From Km. 0.000 to Km. 81.257) in the state of Odisha on Performance Based Maintenance Contract (PBMC) Mode