Loading…
Loading…
758 results • Recent activity
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode.
Consultancy services for Independent Engineer for Construction of 4Lane Access controlled Highway from Vakalapudi Light House to Annavaram (on NH16) section of NH-516F from Km. 0.000 to Km. 40.621 on HAM under BMP, Phase1 in Andhra Pradesh.
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
Strengthening ans Improvement of Gorakhpur Kasia UP Bihar Section of NH27
Unbranded Cardboard / Duplex Board Lever Arch Box File/Index File, Unbranded Cardboard / Duplex Board Lever Arch Box File/Index File for 21 cm x 29.7 cm (A4) size document