Loading…
Loading…
758 results • Recent activity
Cons. of Long-Term Remedial mea. River cut/bank erosion at identified 19 locations (i.e. ARC-16 ARC-46 RC-28 RC-29 ARC-36 ARC-37 ARC-38 ARC-39 ARC-31 ARC-32 ARC-33 ARC-34 ARC-35 RC-16 ARC-17 ARC-18 RC-26 ARC-29 ARC-30) KULLU TO MANALI NH-03 in HP
Upgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
Rehabilitation and strengthening along with integrated routine maintenance incl. IM of 4 n 6 laning of Delhi Haryana Border to Rohtak sec of NH9 Km29.650 to Km93.140 include Bahadurgarh n Rohtak Bypasses in Haryana on Item Rate Percentage basis
Construction of Elevated Corridor at Kherwara Town on Udaipur Ratanpur Shamlaji Section of NH-48 in Udaipur District in the State of Rajasthan on EPC mode.
Operation and Maintenance of Ujjain Badnawar 4lane section of NH752D Construction of 15MM High Transverse Bar Marking at Exist location of all Underpass for Safety Measures at Ujjain, Badnagar and Badnawar tehsil under Road Safety
Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch. 61.878 and 63.845 for Jamb Junction in the State of Maharashtra on EPC mode. Regarding appraisal by IAC