Loading…
Loading…
83 results • Latest
Refurbishment of 02 Nos Turbine Runners of 100 MW capacity Francis Hydro Generating Units of Chamera II Power Station
Refurbishment of Turbine-Runner of 100 MW capacity Francis Hydro-Generating Unit of Chamera II Power Station as per enclosed Annexure-I (Extent of Damage and its enclosures), Annexure-II (Relevant Drawings), Annexure-III (Scope of work) Annexure-IV (Special Conditions of Contract) and enclosed Quality Assurance Plan including Transportation charges from Power House, Chamera-II Power Station to Firm's Premises and back.
Repair and strengthening of internal road of SLP Gerukamukh.
Maintenance of bituminous surface road Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air of any appropriate method filled with 75 mm B.M applying bitumen emulsion prime coat at bottom and bitumen emulsion tack coat on sides and on bottom as per technical specification Clause 502 and 503.
Repair of existing air ventilation duct of Air Ventilation System in Silt Flushing Tunnel at dam site of Chamera Power Station II
Repair including supply, fabrication and installation of existing ventilation duct for silt flushing tunnel of dam chamera power station-II at site GSS sheet metal rectangular/round ducting complete with new neoprene rubber gaskets, elbows, splitter, dampers, vanes, hangers, supports, etc .
Repair, painting and other necessary works of TRT (Tail Race Tunnel) view point at CPS-1, Khairi.
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Ordinary cement without any pigment.
Construction of Boundary Wall Around Administrative Building, Field Hostel, VIP Guest House and Land Property of Rangit-IV HEP, Sikkim
Clearing jungle including uprooting of rank vegetation, grass, brushwood,trees and saplings of girth upto 30cm measured at a height of m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Repair and Renovation of School Hospital of Dr. Grahams Homes, Kalimpong
Wood work in posts, post plates, rafters, battens, truss members, purlins etc. fitted and fixed complete (excluding the cost of bolts, paints, but including the cost of nails, screws etc.) (The quantum should be corrected upto three decimals) (a) Sal Siliguri