Loading…
Loading…
105 results • Latest
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of RAJARAMCHAK Water
Shifting of UPVC/HDPE pipe line with Repairing of FHTC for construction of drain by PWD at Malatipur Bazar under Chanchal Sub-Division in the District of Malda under Malda Division, PHE Dte. (2nd Call)
Rectification of repair of existing FHTC connection for PURBA BINODPUR Piped Water Supply Scheme at Gazole Dev. Block in the District of Malda under Malda Division, PHE Dte. (2nd Call)
Rectification of repair of existing FHTC connection for DALLA Piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division, PHE Dte. (2nd Call)
Rectification of repair of existing FHTC connection for KADIRPUR Piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division, PHE Dte. (2nd Call)
Revamping of Valves, Electric Actuator and Control Panel for Filter Bed of BALUPUR Water treatment Plant at Ratua-I Block under Malda Division, PHE Dte, Malda. (2nd Call)