Loading…
Loading…
105 results • Latest
Supply and delivery of different dia. CIDF Sluice Valves at Chanchal Stack Yard for different schemes under Malda Division, PHE Dte. (2nd Call)
Construction of Boundary Wall at Head Work site of SULTANNAGAR Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design,Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 25m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head work site of PURBA BINODPUR
Construction of Boundary Wall at 3rd Tube well site of DEOTALA Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 35m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head work site of AKALPUR
Construction of Boundary Wall at 2nd Tube Well site of SULTANNAGAR Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)