Loading…
Loading…
105 results • Latest
Construction of Boundary Wall at Head Work site of NASIPUR Water Supply Scheme under Ratua-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Conversion of IEP (Iron Elimination Plant) to AIRP (Arsenic and Iron Removal Plant) including necessary Design, Engineering, Structural and Hydraulic details, Proper sizing, supply, construction, erection and commissioning including all arrangements
Construction and Installation of AIRP (Arsenic and Iron Removal Plant) including necessary Design, Engineering, Structural and Hydraulic details, Proper sizing, supply, construction, erection and commissioning including all arrangements of Oxidation,
Sinking of 200mm (all through) Big dia. Tube Well, Construction of Pump House, Boundary wall, Approach Road, Land Development, Laying of Parallel/ Dedicated Pipeline, Providing Balance FHTC and Laying of Rising Main of Ratua Zone-I PWSS under Ratua-
Laying of Parallel/Dedicated Pipeline improvement of functionality and Providing FHTC at Balupur Zone-III under Ratua-I Block under Malda Division, PHE Dte, Govt. of West Bengal.
Laying of Parallel/ Dedicated Pipeline, Providing Common Manifold Augmentation of OHR and allied work for better Functionality at SAMBALPUR Piped Water Supply Scheme at Ratua-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Ben