Loading…
Loading…
504 results • Latest
25 kV AC Electrification work for balance work of "Prayagraj Yard remodeling work (Sanctioned under umbrella work 2019-20) (P.B. Item No. 92 of 2019-20)
1(a) Preparation of design and drawings for Per Track overhead equipment and verification of KM purchaser pegging plan.
SUPPLY AND INSTALLATION OF SET OF AEROSOL FIRE DETECTION & SUPPRESSION SYSTEMCONSISTING OF FIRE SUPPRESSION SYSTEM CARTRIDGES OF 100G - 1 NO., SENSING CABLE - 1 NO.,ACTUATING DEVICE 1 NO., AS PER THE TECHNICAL REQUIREMENT SPECIFIED IN THE ANNEXURE SPECIFIED IN THE ANNEXURE G1 OF SPEC NO RDSO/PE/SPEC/AC/0192-2018(REV-1). THIS SHALL BE INSTALLED IN SBC OF LHB AC COACHES & LWLRRM. ALL MODIFICATIONS, BACK PIECES, INSTALLATION BRACKETS & ACCESSORIES REQUIRED FOR INSTALLATION OF THIS ITEM SHALL BE WITHIN THE SCOPE OF SUPPLY. ONLY RDSO/RCF/ICF/MCF APPROVED MAKES WILL BE ACCEPTED. MATERIAL TO BE PROCURED FROM OEM/AUTHORISED DEALER OF OEM. CERTIFICATE OF AUTHORISED DEALERSHIP TO BE SUBMITTED ALONG WITH TENDER. PROOF OF PURCHASE OF MATERIAL FROM OEM/AUTHORISED DEALER TO BE SUBMITTED ALONG WITH SUPPLY. TEST CERTIFICATES AS PER RDSO SPECIFICATION SHALL BE SUBMITTED ALONG WITH SUPPLY Make- Any RDSO Approved Make.
Description :SUPPLY AND INSTALLATION OF SET OF AEROSOL FIRE DETECTION & SUPPRESSION SYSTEMC ONSISTING OF FIRE SUPPRESSION SYSTEM CARTRIDGES OF 100G - 1 NO., SENSING CABLE - 1 NO.,ACTUATI NG DEVICE 1 NO., AS PER THE TECHNICAL REQUIREMENT SPECIFIED IN THE ANNEXURE SPECIFIED IN THE A NNEXURE G1 OF SPEC NO RDSO/PE/SPEC/AC/0192-2018(REV-1). THIS SHALL BE INSTALLED IN SBC OF LHB AC COACHES & LWLRRM. ALL MODIFICATIONS, BACK PIECES, INSTALLATION BRACKETS & ACCESSORIES RE QUIRED FOR INSTALLATION OF THIS ITEM SHALL BE WITHIN THE SCOPE OF SUPPLY. ONLY RDSO2 APPROVE D MAKES WILL BE ACCEPTED. MATERIAL TO BE PROCURED FROM OEM/AUTHORISED DEALER OF OEM. CERT IFICATE OF AUTHORISED DEALERSHIP TO BE SUBMITTED ALONG WITH TENDER. PROOF OF PURCHASE OF M ATERIAL FROM OEM/AUTHORISED DEALER TO BE SUBMITTED ALONG WITH SUPPLY. TEST CERTIFICATES AS PER RDSO SPECIFICATION SHALL BE SUBMITTED ALONG WITH SUPPLY Make- Any RDSO Approved Make. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/TL/AGC, NCR Uttar Pradesh 34.00 Numbers
Supply and Installation of Aerosol Fie detection and suppression system cartridge minimum 10 gram as per the Annexure G1 of RDSO Specification No.RDSO/PE/SPEC/AC/0192-2018(Rev-1) .All necessary modification and back pieces and accessories required for installation of this item shall be with the scope of Supplier-Make-Firepro,Stat-X pyrogen,Hafex DSPA o any other RDSO approved make .
Description :Supply and Installation of Aerosol Fie detection and suppression system cartridge minimum 1
AIR CLEANER ELEMENT OUTER
Description :AIR CLEANER ELEMENT OUTER as per Deutz Part no. 0165-22-163A and Donaldson Part no. P182039, Make : Deutz, Donaldson [ Warranty Period: 30 Months after the date of delivery ] ] Consignee DSK//TMD/JHANSI, NCR Uttar Pradesh 8.00 Numbers
Air Cleaner Elemen
Description :Air Cleaner Element as per Deutz part no 0165-22-248-V08-U and Donaldson part no P1820 40; Make - DEUTZ, DONALDSON. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee DSK//TMD/JHANSI, NCR Uttar Pradesh 4.00 Numbers
PROLACTIN KIT 1X60 TEST
Description :PROLACTIN KIT 1X60 TEST (Make - Biomeriux india pvt ltd ) [ Warranty Period: 30 Months a fter the date of delivery ] ] Consignee CMS/JHS, NCR Uttar Pradesh 4.00 Numbers