Loading…
Loading…
184 results • Latest
TOP BLOCK ASSY 32 CFM, Part no. X020007B, STARTER 15 HP, Part no. 518903031, MOTOR 15 HP, Part no. 518803040, MOTOR PULLER, Part no. 00043570B, V BELT, Part no. 000905435, AFTERCOOLER PIPE NO 1, Part no. 000110940, PRESSURE GAUGE, Part no. 000469940, SILENCER, Part no. 000470010, SHUT OF VALVE ASSY, Part no. 000315240, KIT, DISCHARGE VALVE ASSY, Part no. 022400979, PRESSURE SWITCH ASSY, Part no. 022400879, NON RETURN VALVE ASSEMBLY, 2 BSP, Part no. 022400849, SAFETY VALVE ASSY. 3 by 4 BSP, Part no. 0004356A, SAFETY VALVE ASSY 1 1 by 2 INCH BSP, Part no. 00043457A, VALVE SAFETY ASSEMBLY 1 by 2 INCH BSP, Part no. E34571A, NON RETURN VALVE ASSY, Part no. 000314712, Part no. 000152051, AIR FILTER ASSY, Part no. 000213970, BELT GUARD, Part no. 000212230, AFTERCOOLER PIPE NO 2, Part no. 000314290, ERMETO 1 INCH X 1 INCH BSP, Part no. 000432100, GREASE NIPPLE, Part no. 000525910, MOUTH PIECE, Part no. 000449510, PRESSURE SWITCH ASSY., Part no. 00031075A
GEAR OIL-INDUSTRIAL ISO VG EP 460, OTHER SPECIAL GREASE (Centralized Lubrication Grease), OPEN GEAR LUBRICANT COAT 190 (OPEN GEAR LUBRICANT)
Bus Hiring Service - Regular Basis - Local; As per
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper, Isuzu Dmax, Tata Xenon; The vehicles to be deployed should not be more than three years old from the date of its first RTO registration on the last date of submis..
Reverse Osmosisbased Water Treatment Systemabove50 LPH Capacity (V2) (Q2)
Deep Freezer Markedto IS7872 (Under BISScheme1) (V2) (Q2)
Upkeeping and Maintenance of Kota booster and Kakri booster pump house of IWSS for 2 Years
Water proofing work by APP of industrial buildings at Khadia Project
Shifting of weigh bridge number 7 and 8 to another location near spur siding at jayant project
Making conference room with allied civil works at new view point at Jayant Project
Repairing/ overhauling of engine model (S-4) fitted in 10Tn ESCORT Make EC-01 Crane at Kakri Project.
Repairing_Rewinding of Arma-ture of Hoist Drag Motor Ca-pacity 1300HP of 24_96 Dragline
Repairing, of 01No. track chain assembly of REL-850E model Drill of Amlohri Project.
Complete installation of Vehicle Location Tracking Device (VLTD) with certification as per RTO norms for fitness and permit of 19 departmental vehicles at Kakri Project.
Providing sheds at Base Workshop for stacking, storing and Safeguarding HEMM parts at Khadia Project
Twist Drill (Parallel Shank) as per IS 5102 (V2) (Q3), HSS Taper Shank Twist Drills (Short Series) (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
EXTENSION AS VALVE-part no. -1767281, EXTENSION AS VALVE-part no. -3564135, HOSE AS-part no. -2301132
Spares of Single Point Lubrication System
Professional Training Services (Version 2) - offline; Weekdays
Annual maintenance contract (AMC) of AC of 33by72 Somnath dragline of Khadia Project.
Repairing and rewinding of 02 Nos. CVT, 01 No 7.5 KVA CPE transformer for BE Marion and 01 No. 40HP 30KW,3 Phase 415V slip ring insulation motor of EOT Crane of Base workshop at Nigahi project.
Repairing, rewinding and servicing of ceiling fans and exhaust fans installed at different locations in Kakri Project.
General Upkeeping and sanitation work of coal workshop Premises, Coal substation ,E and M workshop, old Regional Store , VTC Coal analysis Lab, New Canteen ,CHP office and its premises for two years at Khadia Project
Facility Management Services - LumpSum Based - Coal Handling Plant; Upkeep and Cleaning of Coal Handling Plant; Consumables to be provided by service provider (inclusive in contract cost)
Procurement of maintenance spares for ACE Cranes of
Camera for CCTV System (V3), Video Recorder for CCTV System (V2), Ethernet Cables, Computer Monitor (V2), HARD DISK 8 TB, MEDIA CONVERTER DUAL CORE
Trimming of tree, shrubs and branches under and around of 33KV OH/line drawn from main S/S bina to S/S A at Kakri project
AMC for servicing/maintenance of two numbers of Harison make 25 KVA DG sets installed at the AGM Office and Officers Club, Kakri Project, for a period of two years
AMC for maintenance of RED DOT Air conditioning system of operator cabin of BEML Equipment i.e. 13 nos. BD355 Dozers and 07 nos. BWS-70 water sprinklers for a period of 01 year (365 Days) and 01 No WS28-2 water sprinkler for a period of 5 Months.
Rectification/repairing of troughing idler frame including fitting of new troughing idler at conveyor no. 1,2,3 and 33,34 and replacement of Top idler after repairing bracket of Section-I and PR Section-IlI respectively at CHP Jayant Project.
Teeth build up and Hardfacing of crusher teeth of CHP Phase I in Khadia Project for a period of 730 days
Development works near canteen and rest shelter and extension of existing building for shift incharge and staff at OB time office at Khadia Project.
Part No. 4107013776 Adapter, Part No. 4107013778 Adapter Lock, Part No. 4107013775 Tooth Point, Part No. 4107013777 Tooth Point Lock
Custom Bid for Services - ---- Similar Category Annual Maintenance Service - Photocopier Machine
Spares for AFDSS of CAT 777E Dumpers
Alternator for Komatsu Dozer, Starting Motor for Komatsu Dozer, Cable for Komatsu Dozer
Facility Management Services - LumpSum Based - TOWNSHIP; HIRING AND FIXING OF DECORATIVE LED JHALAR LIGHT; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - OB and Coal substation of Khadia Project; Day to day operation of OB and Coal substation of Khadia Project as required for a period for a period of 730 days; Consumables to be provided by service provide..
Non - Contact Voltage Tester (Q3), Non-Contact High Voltage Detector (Q3) (3 (3 ))