Loading…
Loading…
182 results • Latest
Renovation of toilets of HOD room of GM Office at Nigahi Project
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Development work in Krishnakunj and surrounding area at Krishnashila Project.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Repair and maintenance of HT OH power Transmission line throughout monsoon season
Replacement/providing of lighting arrestor 6KV grade ISI mark as per the instruction of EIC(all material supplied by the contractor)
Repairing of (A) Replacement of bottom wear plates and repairing of damaged bottom plates of tub base (B) Repairing of Major cracks developed in Jib head pulley assembly (C) Repairing of Cracks at various places in A Frame Boom Assembly (D) Repairing
Replacement of bottom wear plates and repairing of damaged bottom plates of tub base of 24/96 Krishna Dragline :
Clearing and grubing of land including diversion of natural nallah and demarcation of boundary of proposed R and R site at Nigahi Project
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Fabrication, transportation, and installation of 300 Nos. of Indicator Post wrapped with fluorescent tape, along sides and divider of haul road at Bina Project.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and remaining of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within lead of 50 m. (all kind of soil) [Code: 2.6.1 of analysed DSR-2023] ( for each job 0.072 Cum @ INR 152.50 = INR 10.958)