Loading…
Loading…
1,474 results • Recent activity
Arrangement of drinking water PIYAUU at two places at Khadia Area
Overhauling, repairing and maintenance of 33KV and 6.6 KV Gr Gang operating Air Break Switch (GOAB/Isolator) installed at 33KV/6.6KV, 4X10 MVA Tapovan and 2X10 MVA , Coal substation of Amlohri project
Painting of the dumpers and water sprinklers of Bina Project, H11, H12, H18,WS07, WS08, WS10 and WS11. (Repair work to be carried out at NCL site)
Dismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at RLS line no1, 2 and 3 in Amlohri CHP Phase-I and Phase-II
Re-babbiting/reconditioning of Eccentric with gear assembly of HEC make Primary Gyratory Crusher (Type- PGC 1500H) installed at CHP Phase-II, Amlohri Project
Procurement of Rotate Shaft of 24/96 Dragline