Loading…
Loading…
14,177 results • Latest
Maintenance repair kit for E-70 BP isolating
Train Set Nose Cone Coupler Cover for Vande Bharat Express (Colour - Orange) ICF Drg.
M-12 X 40 mm CSK Head Bolt with Nut & Spring Washer (for Nylon Wear Plate) for BLCS Wagon.
ORION 355 (Wash consumable for bearing cleaning plant)
Emergency Brake Valve to DLW Drg. No. 8136987
Simulation Key Switch (Pos. No. 179) for 3-Phase locomotives as per CLW specification No. CLW/ES/3/0079 ALT-A or latest and CLW Drg. No. CLW/ES/3/SK1/0079 ALT-A or latest
PANTO ISOLATING KEY FOR THREE-PHASE LOCOMOTIVES (BLUE COLOUR) AS PER M/S PATRA DRG. NO. PCE/PC-LK/001 OR M/S AAL PT. NO. 4360002700 OR EQUIVALENT CONFORMING TO CLW SPEC./DRG. NO. CLW/ES/3/ SK-3/ 0049
POH Kit for KBI make emergency brake cable box for LHB coaches consisting of 09 items as per Annexure - I.
Cordless Drill Machine with 02 Nos. of 18 V or Higher Rechargeable Li-Ion Batteries with Battery Capacity of 2.0 AH or higher. Specification as per atteched annexure "A".
4 WIRE DTMF Way Station Equipment
Hydraulic Pinion Extractor of Capacity 40000 PSI with 2 meter length, Ultra High Pressure Thermoplastic Fixable Hose mounted on U-Frame As per DLW/PATIALA'S Drg. No: ET0385
PINION SHAFT FOR WAP-7 LOCO 20 TEETH AS PER RDSO SPEC.NO MPO.2800.19 [REV-1] OF June-2019 or Latest AND RDSO DRG. NO SKDP-3473 ALT-4 or latest.
SAFETY VALVE 3/4 INCH BSP TYPE 9 AS PER M/S FTRTIPL PART NO 024001000 FOR E-70 BRAKE SYSTEM OF THREE-PHASE LOCOMOTIVES
4 Wire way station control telephone to specification No.IRS:TC:38-97 With latest amendment.
(PH NO. : 25075) SUNITINIB 50 MG TAB
SOCKET HEAD CAP SCREW M20X80 MM FOR GEAR CASE GRADE 12.9 TO IS:1367
Clevis as per M/s FAS Drg. No. C50690
ADD Valve for WBL 22.03 Schunk Make Pantograph fitted in Vande Bharat Express Specification %u2013 Part No - Schunk Part No.909010012600 Drg. No.- 2-V15. 16191
SET OF NEST AND INDENTOR DIES
SODIUM CHLORIDE 5% EYE DROPS
Supply, Installation and Commissioning of Non Contact Laser scanning based wheel profile measurement System as per attached specification.
AMI No- 9.135/2026-27 tab./cap. Lansoprazole 30mg Dispersible
SUPPLY OF CAST VINYL AND GRAPHIC
Monthly Basis Cab & Taxi Hiring Services - MUV; 6000 Km x 720 hours; Outstation 24*7
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Television (V3) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of DPC bogie frame plate with extraction of broken bolt per scope of work; Repairing of DPC bogie frame plate with extraction of broken bolt per scope of work;..
GIS mapping of Encroachment, Plantation, Grow more food, Vacant Railway land etc. on Railway land in the jurisdiction of Sr.DEN-lII/FZR & DEN-HQ/FZR using Survey grade hand held GPS device and processing the data in (.Shp) file format, duly link with the attributes of assets as required for IR GEO portal.
Casting of PSC slabs from 3.05m to 12.2m based on approved drawings in the PSC Yard of Bridge Workshop, Jalandhar Cantt
Cleaning of DEMU Coaches, Bogie Components and Bull Gears as per scope of work.
Augmentation and facility enhancement of crew and train manager lobby at Charbagh Lucknow in the section of SSE/W/CB/LKO under ADEN/HQ/LKO.
Outsourcing of maintenance activities for PSI assets of Budgam (BDGM) & Banihal (BAHL) TRD depots under the jurisdiction of ADEE/TR/BDGM over JAT division for 2 year
Calibration Services - As mentioned in Tender
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km per month and 720 Hrs; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - MUV; 1200 km x 208 hours; Outstation 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Rolling Stock Workshop Charbagh- Repairing/replacement of different electrical parts of ACP with fitment Lucknow; RRepairing/replacement of Switches (02 Nos per coache.., and Installation of Plant/Systems/Equipments (Version 2) - Rolling Stock Workshop Charbagh- Repairing/replacement of different electrical parts of ACP with fitment Lucknow; Repairing/replacement of Plate (02 Nos per coaches); .., and Installation of Plant Systems/Equipments (Version 2) - Rolling Stock Workshop Charbagh- Repairing/replacement of different electrical parts of ACP with fitment Lucknow; Repairing/replacement of Switch cover (02 Nos per coa.., and Installation of Plant/Systems/Equipments (Version 2) - Rolling Stock Workshop Charbagh- Repairing/replacement of different electrical parts of ACP with fitment Lucknow; Repairing/replacement of Light with box (02 Nos per c.., and Installation of Plant Systems/Equipments (Version 2) - Rolling Stock Workshop Charbagh- Repairing/replacement of different electrical parts of ACP with fitment Lucknow; Repairing work of exhaust muffler thermal insulation c..
Repair and Overhauling Service - Repairing of Schaku coupler housing of TC/DPC coaches; Repairing of Schaku coupler housing of TC/DPC coaches; Yes; Buyer Premises