Loading…
Loading…
Found 4 active tenders
4 results • Latest
WASTE MANAGEMENT AND OTHER INFRASTRUCTURE WORKS AT NTECL
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth,lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soilcum
Procurement of crusher hammer for CHP
AC-72H-SJ-NF:INDIGENOUS HAMMER
BITUMINOUS PAVEMENT FOR NTECL ASH DYKE BUND ROADS
Scarifying metalled (water-bound) road surface including disposal of rubbish lead upto 50m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10tonne capacity.
Formation of WBM Road on top of Ash dyke at NTECL
PART -A DSR ITEMS