Loading…
Loading…
2,315 results • Recent activity
Construction of Balance of Plant (BoP) Buildings and Structures of KKNPP 5and6.NPCIL/KK5and6/CIVIL/PT/2025/27
Gas Cutting Nozzles (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Supply of Hydrogen Leak detectors, Supply of 19 inch Rack mounted Multi channel controller, Supply of 4 core 1.5 sq. mm shielded cable
SS 316 NPT MALE CONNECTION AT BOTH 1inch ID 3M length, 1 inch hose with length 5m and SS-316 1 inch male MNPT end fitting., 1 inch hose with length 10m and SS-316 1 inch male MNPT end fitting., 1 BY 2 inch hose with length 5m and SS-316 1 by 2 inch male MNPT end fitting., 1 by 2 inch hose with length 10m and SS-316 1 by 2 inch male MNPT end fitting.
Supply, Erection and Commissioning of 250 TR Centrifugal Chiller - as per enclosed specifications.
Big carbon bearing(Material -MY3A) for NIKKISSO make canned rotor pump as per drawing (RAPP/34932/14, Small carbon bearing(Material -MY3A) for NIKKISSO make canned rotor pump as per drawing (RAPP/34932