Loading…
Loading…
2,339 results • Recent activity
telephone instrument single push button (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6968101 Dated : 24-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of Operation water storage pond (OSP) and other associated/ miscellaneous works for Gorakhpur Haryana Anu Vidyut Pariyojana-1 and2 (GHAVP-1and2) at Vill. Gorakhpur, Distt. Fatehabad, Haryana.
HDPE Bucket (V2) Conforming to IS 3730 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7016664 Dated : 18-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Procurement of Raw Material, Manufacturing, Inspection, Testing, Packing and Supply of Snout Bung fo
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; As per Scope of Work/ATC; As per Scope of Work/ATC
tightness checks and rep.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 220kV Line tension insulator Cleaning and tightness of wall bracket for support at TB wall (Total quantity 1 is equal.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Cleaning and tightness of sky ground wire connections (Tower top and ground) (Total quantity 1 is equal to 51 set for.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 220kV Switchyard Insulators cleaning, inspection and connection tightness of CT/PT/CVT/LA/SUT/GT HV bushin.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Assistance for disconnection and connection of 220kV CT/PT/CVT/GT/SUT/UT Terminals for diagnostic testing o.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 220kV Line Wave trap cleaning, inspection and connection tightness (Total quantity 1 is equal to 7 Numbers for two ye.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 220kV Switchyard Bus post insulators (vertically mounted on ground) cleaning, inspection and connection tightness (To.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 21 kV Isolated phase bus duct cleaning, inspection and connection tightness and replacement of Gasket and sealing etc.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, 220kV Switchyard Overhead AAC strained all aluminum Conductor/jumper replacement up to twenty meter length piece (T.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of 220/132 KV LA (Total quantity 1 is equal to 6 Numbers for two years); As per Scope of Work and ATC, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of Single Tension/Suspension string/Wave trap (of 220kV Switchyard) for single conductor (Total quant.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of Double insulator Suspension string set (of 220kV Switchyard) for single conductor (Total quantity 1 is.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of 220kV Switchyard Bus Post Insulator (Total quantity 1 is equal to 2 Numbers for two years); As per Sco.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of Insulator of 220kV Switchyard Isolator (DS)/CT/PT CVT) i.e. complete unit of one phase (Total qu.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of Sky wire (60 meter length each) of 220kV Switchyard (Total quantity 1 is equal to 5 Numbers for two ye.., Repair, Maintenance, and Installation of Plant Bid Details 2/35 Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of 245 kV SF6 CB MOCB complete unit of one Phase/Pole (Total quantity 1 is equal to 3 Numbers for two.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Replacement of Overhead AAC strained all-aluminum conductor of 30 mm diameter replacement up to 160 meter length piec.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 1 and 2; Electrical System or Installation, Site visit charges of four persons from bidders premises to RR Site Unit 1 and 2, for carrying out the operational em..