Loading
Loading…
Loading…
2 results • Latest
work for protection of exposed 11KV live armoured cable over 20 metre stretch. Includes manual excavation minimum 3 feet depth 2 feet width, sand cushioning, dry brick on edge protection with class 7.5 bricks, RCC 1 1.5 3 trench cover with mild steel
Supply Installation Testing Commissioning of 30 meter Guyed Mast and Dismantling works of 40 meter Self Supporting Tower at 100 watts FM Nazira