Supply of cast iron billet plate for 25T gantry crane of Lower Suktel Irrigation Project .
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Improvement to right bank service road from RD 11600 M to 15400 M of Disty. No.12 Main of Taladanda Main Canal.
Improvement to road on right bank of Pattamundai canal from village Jaleswarpur to Chainpal.
Dredging, Nourishment and Protection to river bank near Lower Baliyatra Ground on Mahanadi Right from Cantonment Gada to Seashore Boat Club for Mahanadi River Front Development Project.
Improvement to road on CE No. 78 (A) on Mahanadi right embankment from RD 69.500 Km to RD 73.500 Km.
Improvement to service road of Kalio Sub-minor from RD 0.00 Km to 3.60 Km.
Renovation of Sukal Distributary from RD 15.80 Km to 24.00 Km of Sakhigopal Branch Canal System.
Improvement to road on right bank service road of Sakhigopal Branch Canal from RD 28900 M to 30910 M and from 3330 M to 35180 M.
Improvement to road on Bhargavi left embankment from RD 58.20 Km to 62.700 Km.
Improvement to road on Bhargavi right embankment from village Biranarasinghapur to Dobandha from RD 48.00 Km to 48.600 Km and RD 51.100 Km to 55.500 Km.
Improvement to Service Road on left bank of Gop Branch Canal from RD 42.500 Km to 49.500 Km.
Improvement to service road of Banapur Main Canal between RD 17.00 Km to RD 18.80 Km and Sahaspur Distributary between RD 0.00 Km to 4.00 Km of Salia Irrigation Project.
Improvement to right bank of Daya West Branch Canal from RD 24.170 Km to 26.270 Km and left bank from RD 26.270 Km to 26.840 Km.
Improvement to service road over Dahuka right embankment from RD 12.780 Km to 15.800 Km.
Improvement to service road of Sumandal Main Canal from RD 14.00 Km to RD 17.00 Km, Service road of Kaniaribadi Distributary from RD 00 Km to 1.20 Km and Service road of Sardhapur Distributary from RD 00 Km to 3.00 Km of Salia Irrigation Project
Improvement to Left Bank Service Road on NBC from RD 18.00 Km to RD 22.20 Km.
Improvement to right bank service road of Sukal distributary from RD 22690 m to 26790 m.
Improvement to Road on Kusabhadra right embankment from RD 28.17 Km to RD 41.00 Km.
Design, manufacture, supply, installation, testing and commissioning of Radial Drilling Machine with standard accessories for Fabrication Shop of Central Workshop, Rasulgarh
Improvement to Kakatpur and Kundhei Distributary of Mahanadi Delta Stage-II by Construction of Barrage over river Prachi near village Bajapur under RIDF-XIV (Balance work and Construction of Intake well, pump house, raw water pumping machinery..
Construction of Sono Barrage Project across river Sono near village Dighi in the district of Mayurbhanj, Odisha including Hydro-Mechanical Works, Afflux Bonds, Instrumentation, Power Connectivity, Road Connectivity, Staff Quarters, 05 (five) nos.
Erection, commissioning testing of Stoplogs for Barrage Bay Gates along with latch arrangement, lifting beam, supporting Ramanadi Diversion weir for integrated Chheligarh Irrigation Project as per drawings, scope of work and instruction of engine
SEPARATE PIPE LINE FROM SALIA RESERVOIR TO INTAKE POINT AT INS CHILIKA (SOLOPOKHARI PUMP HOUSE) TO SUPPLY WATER THROUGHOUT THE YEAR TO MEET 60 LAKH LITRES PER DAY INCLUDING O and M OF THE PROJECT FOR A PERIOD OF FIVE YEARS.
Automation of spillway gates controlled through centralized remote control and implementation of real time management information system at Kanupur Irrigation Project, Basudevpur, Dist. Keonjhar (Odisha).
Supplying, Installation, Testing and Commissioning of Fire Hydrant, Fire Alarm, Public Address, Fire Extinguishers and Safety Signage at OCAC Tower, Bhubaneswar.
Dismantling, removal and shifting of existing radial gates with its components and erection of new radial gates Dismantling of hoist bridge including hoisting arrangements and re-erection of the same after erection of new radial gate muran dam
Fabrication, machining assembly of 2nd stage embedded parts for Stoplog, leaves, Stoplog latch arrangement, monorail supporting structure for Barrage bay extra bay and monorail walkway for Malaguni Barrage Project
Construction of Additional floor (First floor (Part) and Second floor) in Existing Hostel Building for Institute of Mathematics and Application at Andharua, Bhubaneswar for the Year 2025-26.
Construction of In-stream Storage Structures at Kursud(Sindheikela) across river Indra/Sundar of State of Odisha including Hydro-mechanical works, Power Connectivity works, Road Connectivity, Staff Quarters including Survey, Investigation, Planning..
Construction of In-stream Storage Structures at Patharla across river Indra/Sundar of State of Odisha including Hydro-mechanical works, Power Connectivity works, Road Connectivity, Staff Quarters including Survey, Investigation, Planning, Design..
Request for Proposal (RFP) for engagement of Consultant for Documentation and processing of Forest Diversion Proposal (Both Stage-I an Stage-II) for Mankada Irrigation Project under Angul District of Odisha.(BID Identification No OCCL-CDC/03/2025-26
C.C lining of Bardia Minor including renovation of Canal structure in between RD 00M to 1500M of Pattamundai Canal.
Extension of Sub-Divisional Veterinary Hospital at Padmapur,in Bargarh District.
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Supply of Wire Rope drum ,Rope Clamp,Bronze Bush ,Drum Gear , Second Gear , First Pinion , Second Pinion in finished machining condition for 10T Rope Drum Hoist to operate 8300mm x 2000mm Barrage Bay gates for Integrated Chheligarh Irr. Project.
geeken Mid-back Revolving Chair of Adjustable height with, geeken Mid-back Revolving Chair of Adjustable height with Wheels
hp Electrophotography/Xerography (Laser/LED) Colour A4 and Legal, hp Electrophotography/Xerography (Laser/LED) Colour A4 and Legal Size Multifunction Printer (MFP)
Construction of Approach Road to Duduguda MIP from RD 00 M to RD 2000M.