| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹78.2 LAccepted-Finance BARAMYNDA BHUBANESWAR | BHADRAK | ODISHA | 755007 | ₹78.2 L | L-1 | Accepted-Finance Quoted amount excluding GST |
| 2 | L-2₹1.5 CrRejected-Finance BYE PASS ROAD JEYPORE KORAPUT | KORAPUT | ODISHA | 763001 | ₹1.5 Cr | L-2 | Rejected-Finance Quoted amount excluding GST |
| 3 | L-3₹1.6 CrRejected-Finance | ₹1.6 Cr | L-3 | Rejected-Finance Quoted amount excluding GST |
| Sl No | Description | Qty | Unit | KAMAKSHI ENGINEERING WORKS L3 | NEELAMADHAB ENGINEERING WORKS L2 | Trinath Engineers L1 |
|---|---|---|---|---|---|---|
| 1.00RADIAL GATES OF INDRAVATI DAM (BAY NO. 4 & 5) | ||||||
| 1.01 | Dismantling, removal and shifting of existing radial gates in bay No. 4 & 5 with its components by cutting into pieces including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge | 156.46 | MT | 15,500 ₹24.3 L | 14,000 ₹21.9 L | 7,000 ₹11.0 L |
| 1.02 | Dismantling and removal of existing hoist bridge in bay No. 4 & 5 including hoisting arrangements, wire rope assemblies etc. including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge. | 80 | MT | 15,500 ₹12.4 L | 14,000 ₹11.2 L | 7,000 ₹5.6 L |
| 1.03 | Erection, commissioning, testing of new radial gates in bay No. 4 & 5 with its components in segmentation method including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge | 156.46 | MT | 21,000 ₹32.9 L | 20,000 ₹31.3 L | 11,500 ₹18.0 L |
| 1.04 | Dismantling of existing trunnion hub assemblies in Bay No. 4 & 5 and erection of the same after rectification / replacemen by new one t, alignment, overhauling including labour, hire charge of machinery, crane, equipments, tools & tackles etc. and direction of Engineer-in-charge | 12.6 | MT | 21,000 ₹2.6 L | 20,000 ₹2.5 L | 7,000 ₹88,200 |
| 1.05 | Re-erection of dismantled hoist bridge & hoisting arrangements in bay No. 4 & 5 with alignment, fabrication, commissioning and testing, fitting of new wire rope assemblies, overhauling of hoisting arrangemnts, application of cardium compound in wire ropes, gear oil topping in worm reducer including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge. | 80 | MT | 21,000 ₹16.8 L | 20,000 ₹16 L | 10,000 ₹8 L |
| 1.06 | Painting of 2 (Two) sets new radial gate and its components in bay No.4 & 5 after surface preparation by blast cleaning process, performed with sand as per requirements and class 'A' of IS : 14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris preferably by air blast with help of blower. Over the prepared surfaces two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less coal tar epoxy paint applied at an interval of 24 hours. Each coat should give a minimum dry film thickness of 150±5 microns. The total dry film thickness of all the coats including primer coating should not less than 350 ±5 microns as per IS: 14177:1994, including sand, labour, machinery, equipments, scaffolding etc.and as per direction of Engineer-in-charge | 3,000 | SQM. | 450 ₹13.5 L | 350 ₹10.5 L | 180 ₹5.4 L |
| 1.07 | Insertion of Stoplog (09 segments) in up-stream side of Radial gates in Bay No. 5 by operating Gantry crane to stop water flow including arrest of leakage with supply of equipments, under water drivers,cotton waste, gunny bags, ropes, labour & transportation charges, manpower, taxes etc. to facilitate dismantling & removal of existing dsmage Gate & its componenets & replacement of new Gate with its componeents of UIHEP, Dist-Nawarangpur (Odisha) complete in all respect as per direction of Engineer-in-charge | 1 | SET (LS) | 450 ₹450 | 1,90,000 ₹1.9 L | 2,00,000 ₹2 L |
| 1.08 | Removal of Stoplog (09 segments) from the grooves & store at places as per direction of Engineer-in-charge | 2 | SET (LS) | 4,50,000 ₹9 L | 2,00,000 ₹4 L | 1,00,000 ₹2 L |
| 2.00RADIAL GATES OF MURAN DAM (BAY NO. 4) | ||||||
Tender Value
Refer Docs
EMD Value
₹86,050
Closing Date
15 Apr 2026, 5:00 pmClosed
General Manager (M) E and M
office of the General Manager(M.),E and M, OCC Ltd., Rasulgarh, Bhubaneswar.
Dismantling, removal and shifting of existing radial gates with its components and erection of new radial gates Dismantling of hoist bridge including hoisting arrangements and re-erection of the same after erection of new radial gate muran dam
2026_OCCL_127701_1
E-Procurement Notice No. 65/OCCL/2025-26 (on-line)
Open Tender
Mechanical Works
150 days
Khatiguda, Nabarangapur
please refer tender documents
3 documents required · 3 mandatory
₹11,800
₹86,050
3 Jun 2026
31 Mar 2026
16 Apr 2026
31 Mar 2026
15 Apr 2026
31 Mar 2026
31 Mar 2026 - 10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1RADIAL GATES OF INDRAVATI DAM (BAY NO. 4 & 5) | ||||||
| 1.01 | Dismantling, removal and shifting of existing radial gates in bay No. 4 & 5 with its components by cutting into pieces including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge | - | MT | - | - | 1 |
| 1.02 | Dismantling and removal of existing hoist bridge in bay No. 4 & 5 including hoisting arrangements, wire rope assemblies etc. including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge. | - | MT | - | - | 1 |
| 1.03 | Erection, commissioning, testing of new radial gates in bay No. 4 & 5 with its components in segmentation method including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge | - | MT | - | - | - |
| 1.04 | Dismantling of existing trunnion hub assemblies in Bay No. 4 & 5 and erection of the same after rectification / replacemen by new one t, alignment, overhauling including labour, hire charge of machinery, crane, equipments, tools & tackles etc. and direction of Engineer-in-charge | 1 | MT | - | - | 1 |
| 1.05 | Re-erection of dismantled hoist bridge & hoisting arrangements in bay No. 4 & 5 with alignment, fabrication, commissioning and testing, fitting of new wire rope assemblies, overhauling of hoisting arrangemnts, application of cardium compound in wire ropes, gear oil topping in worm reducer including labour, hire charge of machinery, crane, equipments, tools & tackles etc. as per direction of Engineer-in-charge. | - | MT | - | - | 2 |
| 1.06 | Painting of 2 (Two) sets new radial gate and its components in bay No.4 & 5 after surface preparation by blast cleaning process, performed with sand as per requirements and class 'A' of IS : 14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris preferably by air blast with help of blower. Over the prepared surfaces two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less coal tar epoxy paint applied at an interval of 24 hours. Each coat should give a minimum dry film thickness of 150±5 microns. The total dry film thickness of all the coats including primer coating should not less than 350 ±5 microns as per IS: 14177:1994, including sand, labour, machinery, equipments, scaffolding etc.and as per direction of Engineer-in-charge | - | SQM. | - | - | 3 |
| 1.07 | Insertion of Stoplog (09 segments) in up-stream side of Radial gates in Bay No. 5 by operating Gantry crane to stop water flow including arrest of leakage with supply of equipments, under water drivers,cotton waste, gunny bags, ropes, labour & transportation charges, manpower, taxes etc. to facilitate dismantling & removal of existing dsmage Gate & its componenets & replacement of new Gate with its componeents of UIHEP, Dist-Nawarangpur (Odisha) complete in all respect as per direction of Engineer-in-charge | - | SET (LS) | - | - | 4 |
| 1.08 | Removal of Stoplog (09 segments) from the grooves & store at places as per direction of Engineer-in-charge | - | SET (LS) | - | - | 4 |
| 2RADIAL GATES OF MURAN DAM (BAY NO. 4) | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
DTCN.pdf
Tender Documents • 1.59 MB
BOQ_586693.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid