Loading…
Loading…
Found 12 active tenders
12 results • Latest
FIC-cum-FRS Site development Sinking of tubewell
Construction of Farmers' Information Centre-cum-Farmers' Rest Shed, Site Development and Tube Well (125 X 100) mm at S.Malpada PPC of Karlamunda Block under RMC, Kesinga Earth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of water pumps sundries & T & P required for the work complete as directed by the Engineer in charge.
Construction of different development work like Pindi with Profile Cover shed, Sinking of Tubewell, Boundary wall with Gate, Approach Road and Farmer Rest shed with information Center at Nandpur PPC of RMC Khariar Road
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.
Construction of different development work like Pindi with Profile Cover shed, Sinking of Tubewell, Boundary wall with Gate, Approach Road and Farmer Rest shed with information Center at Liad PPC of RMC Khariar Road.
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.
Construction of different development work like Pindi with Profile Cover shed at Sialati PPC of RMC Khariar Road
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.
Construction of different development work like Pindi with Profile Cover shed, Sinking of Tubewell, Boundary wall with Gate, Approach Road and Farmer Rest shed with information Center at Khudpej PPC of RMC Khariar Road
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.
Construction of different development work like Pindi with Profile Cover shed, Sinking of Tubewell, Boundary wall with Gate, Approach Road, Farmer Rest shed with information Center at Jamuli (Bolada) PPC, of RMC Khariar Road
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.