Loading…
Loading…
127 results • Recent activity
SH Painting Distempering , drain in back side of New Bus Stand and CGI Sheet roofing in Old Bus Stand
SH Construction of G.I. Sheet Cover Shed for 3 No. Fast Charger at Nahan Workshop Distt-Sirmour (HP) (Under RIDF XXX).
SH Construction of G.I. Sheet Cover Shed for 1 No. Fast Charger at Sunni Bus Stand Distt-Shimla (HP) (Under RIDF XXX).
SH C/o of building portion W.S and S.I, construction of 10 Nos. shops block, boundary wall, paver flooring in yard, septic tank, harvesting tank, construction of edge wall along approach road with 2 Nos. 3.00 meter span R.C.C slab culverts etc.
SH Providing tiles flooring, painting, distempering and aluminum work in cup boards etc.
SH Providing R.C.C. drain in front and back side.