Loading…
Loading…
4 results • Latest
SUPPLY, INSTALLATION AND COMMISSIONING OF AUDIO-VISUAL EQUIPMENT (LIGHTING SYSTEM) AT EDUCATIONAL MULTIMEDIA RESEARCH CENTRE, OSMANIA UNIVERSITY
SUPPLY, INSTALLATION AND COMMISSIONING OF AUDIO-VISUAL EQUIPMENT (CAMERA) AT EDUCATIONAL MULTIMEDIA RESEARCH CENTRE, OSMANIA UNIVERSITY
Providing and Laying Plinth protection to out side wall of the main building back wall towards GTE building and repairing steps, providing railing (Concrete Lab, SM Lab, Fm Lab, Survey Lab wall) at University College of Engineering, Osmania University.
Earth work excavation for (Sump, Ramp, tanks and Open excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil - Manual Means. For Plinth Protection
Providing repairs and maintenace to Old A/15 Quarters on the OU campus
Dismantling of Rough Shahabad Stone flooring on sand bed including labour charges for removing and stacking material with a lead of 100mts as directed by Engineer-incharge etc., complete for finished item of work.