Loading…
Loading…
999 results • Recent activity
Preparation of detailed project report for Saltora Mejia Road from CH 0.00 km to CH 19.16 km, strengthening work by overlaying under Bankura Highway Division in the district of Bankura.
Construction of 2 no. Single cell (1.5mx 1.5m) RCC Box Culvert at Ch. 0.90 Km and 2.60 km and 1 no, Single Cell R.C.C box culvert - (2.0mx2.0m) at Ch.6.60km over Naksa Digsui Inchura Road of Bansberia Highway Sub Division No- II
Repairing work for KALAYANCHAK - SRINAGAR Road from 10.00 KMP to 13.40 KMP under Midnapore Highway Division,P.W.(Roads) Dte. in the District of Paschim Medinipur.
Performing 7 days Traffic Census and Axle Load Survey at 1.61 km of Mejia Kusthol Road ( MDR) in connection with the proposed bridge in replacement of existing vented causeway over river Matabel Jhor at 1.61 km of of Mejia Kusthol Road...2nd Cal
Performing 7 days Traffic Census and Axle Load Survey at 13.91 km of Chhatna Susunia Kustholia Road ( MDR) in connection with the construction of proposed Bridge in place of Old arch type distressed Bridge at 13.91 km of CSK.. 2nd Call
Emergent Potholes Repairing work with some allied work from 3.6 Kmp to 5.3 Km except PHE damaged restored portion of Link Road from Chandannagar Nasibpur Road to Bhadreswar Station Road of Chandannagar Highway Sub-Division under Hooghly Highway