Loading…
Loading…
999 results • Recent activity
Recovery and restoration work of Sarai link road from 0.500 kmp to 2.170 kmp under Hooghly Highway Division No II P.W.Roads Directorate in the District of Hooghly for mending up damages occurred heavy rainfall flood like situation during 2025.
Emergent work for Embankment Protection along with other allied works over Khanyan Tamba road in stretches from 0.00 Kmp. to 1.73 km of Bansberia Highway Sub-Division No II under Hooghly Highway Division No II in the district of Hooghly
Repairing Work of Bandhpur Ichapasara road from 0.00 kmp to 3.00 kmp In Stretches of Serampore Bridge Highway Sub Division under Hooghly Highway Division No-II in the District of Hooghly during the year 2025 2026.
Temporary removal of Height Barriers at both flanks (3 nos.) of Baguihati Flyover on K.N.I. Avenue during VVIP visit and reinstallation the same after completion of VVIP movement.
Supply of Esmac-PR or equivalent product (instant all weather Potholes repair polymeric premix capable of performing in water logged potholes /road repairing compound) with carriage, loading and unloading at Baguihati Stack yard on KNI avenue
Pre monsoon cleaning of road side drain culvert etc. from 0.00 km. to 3.00 km. (Airport flank) of K.N.I. Avenue under Baguihati Highway Sub-Division under Barasat Highway Division No. I in the District of North 24 Parganas.