Loading…
Loading…
26 results • Latest
Upgradation to Two lane with paved shoulders of Jasrapur-Nagali saledi singh-ked-Chhawsari-Titanwar section from design Km 16/300 to design Km 40/980
Widening of existing two lane to four lane of Suratgarh-Sri Ganganagar section from Km. 175.000 to Km. 250.900 of NH-62 in the State of Rajasthan on EPC mode.
Upgradation to 4 lanes with Paved shoulders from design km 0.850 to km 50.246 of Mahwa Mandawar Rajgarh section of NH-921 and Construction of flyover from design km 0.000 to 1.700 of NH-21 (near junction with NH 921) in the State of Rajasthan.
Four laning of Jhunjhunu Chirawa Pacheri Section from design km 0.000 to km 66.700 of NH11 including Chirawa Northern Bypass from design km 0.000(Junction with NH11 at km 33.900)to km 10.260(junction with SH13)in the State of Rajasthan on HAM Mode
Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode
Upgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode.