Loading…
Loading…
26 results • Latest
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.
Construction of Cement Concrete Pavement between Km. 61/800 to Km. 64/300 (Chalala City Portion) of NH-351G in the State of Gujarat.
Upgradation to Four-Lane of Left-Out Stretches of NH-709 from Km 0/700 to Km 3/650 (Rajgarh-Pilani Section up to Haryana Border) in the state of Rajasthan on EPC Mode
SPECIAL REPAIR WORK FROM MUNDAWARA MOD (KM 48/700) TO KUSHALGARH (KM 62/00) VIA TALVRAKSH ON NH-248A SHAHPURA-THANAGAZI- ALWAR-RAMGARHNUH ROAD IN THE STATE OF RAJASTHAN