Loading…
Loading…
81 results • Recent activity
Guna-Gwalior section: Construction of Limited Height subway (LHS) at km.1117/1- 3 (near Laharkota village) between Taravata-Miyana station (by pushing using RH Girder.)
Construction of ROB No.469 in lieu of closing of Manned level crossing at Km 829/15-17 between Vizianagaram-Korukonda stations with spans:1x60.0m camel type truss girder, 1x30.0 CWG +1X18.0m CG +3x30.0m PSC Girder with RE Walls on East Coast Railway.
AII Div.: Electric work due to provision of track machine facilities on existing TMC sidings - 20 Nos.
ADEN (HQ) Ajmer Sub Division: Electric work due to repair's and replace old and damaged pipeline network at Ramganj staff line, Five bungalow and Kasarinadi and others.
Execution of P.Way Works 1) Complete Track Renewal (Primary) of existing 60 Kg 90 UTS rail on 60Kg PSC-14 sleeper with new 60 Kg 90 UTS Rails on 60kg wide based sleepers for a length of 0.773 Tkm from km.1.217 to km.1.99 UNI Line between VSKP-NCC under ADEN/MYD/WAT,2) Through Sleeper Renewal (Primary) of existing PSC 60 Kg sleepers with new wide based 60 Kg sleepers along with deep screening and raising of ballast cushion for a length of 2.837 TKm SCMN-GPT (By-Pass) from Km.0 to 1.322- DN line & km.1.217 to km.1.99 UNI Line between VSKP-NCC under ADEN/Track/WAT.3) Through Turnout Renewal TTR(CS+CMSC)-10 sets under ADEN/MYD on WMY line.4) Through Turnout Renewal -25 sets - TTR(CS)- 11 sets & TTR(CMSC)-14 sets in various sections of Waltair Division 5) Through Turnout Renewal TTR(TFR)-39 sets (1 in 12-6 Sets and 1 in 8% 33 sets) under Sr.DEN/South/WAT.
Execution of P.Way Works: - 1) Complete Track Renewal (Primary) of existing 60 Kg 90 UTS rail on 60Kg PSC-14 sleeper with new 60 Kg 90 UTS Rails on 60kg wide based sleepers for a length of 4.539 Tkm. between DVD-KUK section (In patches) under ADEN/Track/WAT on main line. 2)Through Sleeper Renewal (Primary) of existing PSC 60 Kg sleepers with new wide based 60 Kg sleepers along with deep screening and raising of ballast cushion for a length of 2.590 TKm between SLO- GPT (in patches) under ADEN/Track/WAT. 3) Through Rail Renewal (Primary) with 60Kg rails for a length of 1.300 km (in patches) from km.759.682 to 760.982 DN Line between Gopalapatnam -Duvvada sections under ADEN/Track/WAT.