Loading…
Loading…
292 results • Latest
REPLACEMENT OF DAMAGED PIPE LINE
Providing, lowering, laying and jointing in trenches, standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) . Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. Supply may be in coil or straight length in 6 M/12 M.
NIT 44/2025-26
Maintenance of pipelines irrespective of size and material which includes repairing of bursts and leakages, pollution control, survey and removal of choking, disconnection of illegal connections, collection and recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution/ rising main pipelines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of black top, WBM and CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jjointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job, contractor will use their own T&P. Contractor with his own resources shall arrange de-watering, JCB and tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipeline network of rising and distribution pipeline network within the scope of work for per km pipeline per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed: (132.68 KM)Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS: 5382-1985 including all taxes (Central and local), transportation and freight charges, inspection charges, loading/ unloading charges, including cost of labour and material, specials (Tee, bend etc.) satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge. (excluding earth work) Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.
Rate Contract for Providing and Fixing of Centrifugal Motor Pump Set, Cable, Soft Starter and Valve at Various Head Works Under PHED PDR Division III Bikaner. (Under Canal Closure 2026)
PART-A: AEN PHED PDR SUB DIVISION IX BIKANER
Annual Rate Contract for Work of Repair of Pipeline, Tubewells, Pumpset and Pump House in JJY Schemes PHED Sub Division Ajeetgarh, Division Neem Ka Thana
Maintenance of tubewells which includes round the clockmonitoring of tubewells of all sizes, complete repairs /rewinding of submersible pump sets including cost ofmaterial components required to repair pumpsets, starters,meters etc. of electric panel of tube wells, Lowering andunlowering of pumpsets complete in all respect,maintenance of log-books & Histroy sheet as directed byEngineer-in-charge for tubewell per month.
Construction of Non Mechanical Rapid Gravity Filter Plant 50 KLH at village 36H (Naggi), Sub Division SriKaranpur under BADP
Design, construction, commissioning & testing of Non Mechanical Rapid Gravity Filter Plant of capacity as under (8 hrs working in a day). This work includes construction of RCC receiving chamber, baffle channel, floculator, clarifier, collecting channel, filter beds , operation gallery, clear water chamber, channel, chlorination chamber, pipe system for carrying raw water from Pump House to inlet of RGF, clear water from Plant to CWR, De-sludging system including providing pipe system from clarifier , floculator & back wash water chamber to existing storage tank, Back wash pump set with piping system, , air blower as per design, interconnection of raw water, clear water, sludge pipes etc. including allied works such for construction ,commissioning of system as specified in tender documents at various water supply schemes Above 45 KLH and up to 60 KLH
Construction of Sedimention cum Storage tank at village 39H, Sub Division SriKaranpur under BADP
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils