Loading…
Loading…
19 results • Recent activity
Construction of 3nos. of Retaining wall (fl-ash bricks including all materials) in CM panel W7 of Bagdona seam including all ma-terials at Tawa Mine, Pathakhera Area, WCL.
Construction of 03 Nos fly ash bricks isola-tion Stopping at depillaring Panel E dis of LWS of Chhatarpur Mine No-1, Pathak-hera Area, WCL
Work of hydraulic roof bolting 29813 nos. With resin capsules by providing three (03) hydraulic roof bolting machines for 12LS dis-trict and three (03) hydraulic roof bolting machines for 37L district for depillaring of LWS at Tawa-II Mine
Construction of 14nos. complete isolation stoppings (fly-ash bricks) including all con-struction materials in CM panel W7 depillar-ing panel of Bagdona seam at Tawa Mine, Pathakhera Area, WCL.
Repairing of 5 nos. ventilation stoppings in E8 panel and 18 nos. ventilation stoppings in W7 panel of Bagdona seam including all ma-terials at Tawa Mine, Pathakhera Area.
Transportation of material from surface to underground destination (including loading, unloading, stacking of material, and return-ing empty tubs/loose) at Chhatarpur Mine No. 1, Pathakhera Area, WCL.