Loading…
Loading…
1,189 live693 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PANCHAYAT AND RURAL DEVELOPMENT
1,189 results • Latest
Renewal Coat /Macadamization L080-Pulwama to Akhal via Mitrigam (Length 5.60 KMs),Package No.JK10-166
Engagement Of Consultant for Providing Consultancy Services Including Preparation of DPR for Construction of 04 Nos of Bridges
Repair / Maintenance of Rural Roads other than PMGSY Roads from SH10 connection (Panchpara) to NH12 connection (Mashaldhighi) under Gazole-II G.P. of Gazole block in the district of Malda.
NH 31 to Digravita PMGSY Road Connection
Renewal Coat / Macadamization under Cities and Towns (CandT) on road Gran to Sukhal Ghati (upto Toot) under Pkg No. JK14-514, Block Reasi, District Reasi, Length-19.50 kms, including Initial Rehabilitation, Periodic Renewal, Emergency Works and
Restoration Works of Odata Saras Motor Road Under SDRF Year 2025-26
Repairing of potholes along the road from Jholong to Dak Bunglow Parentar, Package No. WB-07-109, Length 2.60 km
Repairing of potholes along the road from Kumai to Paten Godak, Package No. WB-07-207, Length 3.65KM
Repair of area damaged due to PHE cutting for the road L028-T02 to Samantapara L028 Fatikgachi Busstand to abberia Hospital Via Sidheswar under PMGSY Package No. WB-09-328
Repair and Upgradation of road from Upper Dantay Gaon Lower Dantay Goan RIDF XVII, Bhalukhop G.P., District Kalimpong, Length 3.00 Km
Repairing and Upgradation of road from Link Road to Lower Mayrong Forest, RIDFXXII, Pedong Block, Sakyong G.P., District Kalimpong, Length 5.250 Km
Repair and Upgradation of Road from Todey Main Road to Siddeshwar Dham, Paten Godak GP, Gorubathan Block, Kalimpong District., Length 3.50 km
Repair and Upgradation of road from Shitalban (Bhalukhop) to Permansingh Primary School (Khamdung), RIDF XVIII, Bhalukhop G.P., District Kalimpong, Length 4.90 Km
Repair and Upgradation of Road from Lower Manzing to Upper Manzing, Pokhrey Bong G.P., Gorubathan Block Kalimpong District, Length 5.00 km
Repairing of potholes along the road from Suruk to Godak, Package No. WB-07-207, Length 7.95 km
Repairing of potholes along the road from Kuwapani to Badhey, Package No. WB-07-142, Length 6.80 km
Construction of RCC Pile Foundation Bridge over KAJLI River Bearing Road Package No.WB21134
Construction of RCC Pile Foundation Bridge over MOONSANG River Bearing Road Package No.WB21126
Construction of RCC Bridge on PMGSY Road L030 Tarun Sangha Football Ground at Dakshin Padamati To Helapakri within Maynaguri Block, District-Jalpaiguri, vide Package No.WB10264BR1 at Padamati Chainage 0.015 km
Construction of RCC Pile Foundation Bridge over BAGJHORA River Bearing Road Package No.WB21155
Construction of RCC Pile Foundation Bridge over DHOWLAJHORA River Bearing Road Package No.WB21131
PREPARATION OF BRIDGE DPR INCLUDING INVESTIGATION DESIGN AND DRAWING CHEMBANTHODU KURUVAKKAYAM POOMALA BRIDGE Span 40mt - (Re-E-Quatation)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
L023-Jogesganj to Hemnagar under HINGALGANJ P.S. (Length-1.99Km)
L026-Purba Bholakhali Primary School to Nityabaria under SANDESHKHALI - I P.S. (Length-1.620)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year