Loading…
Loading…
855 results • Latest
Construction and maintenance of road from L027 Dudi Chuntiwari KM5 RD 900 to SHREEN KARAIE Waste Plastics Length 2 500 Kms, Stage Complete Carriageway width 3 75Mtrs PMGSY IV BatchI 2026 27 Package No JK08-4025 PMGSY Division Kupwara
Construction and maintenance of road from L029- KHUMRIYAL TO ZGALI KM11 RD 100 to BAJAD M0HALLA Waste Plastics Length 1.550 Kms, Stage Complete Carriageway width 3.75Mtrs, PMGSY-IV Batch-I 2026-27 Package No. JK08-4049 PMGSY Division Kupwara
Construction and Maintenance of Road L027-(Link Road) From Mahanpur Basholi Road KM 18th to Dugagran Package No. JK07-4043, PMGSY-IV, Batch-I of 2026-27, Block-Dhar Mahanpur, District Kathua (Using Open Graded Premix Carpet (OGPC) Length 8.000 Kms) L
Construction and maintenance of road from L021 Chowkibal Khanabal KM 5 RD 900 to MANZPATHER Waste Plastics Length 2 00 Kms Stage Complete Carriageway width 3 75Mtrs PMGSY IV Batch I 2026 27 Package No JK08 4031 PMGSY Division Kupwara
Construction and Maintenance of Road L122-(Link road) Karol kumate road km 1st RD 0.00 to Notan Package No. JK19-4295, PMGSY-IV, Batch-I of 2026-27, Block-Ramban, District Ramban (Using Waste Plastics Length 2.960 Kms) Length 2.960 Kms
Construction and Maintenance of Road L024-(Link Road)Chandak Mandi Road km 4.2 to Bakrewala Package No. JK11-4068, PMGSY-IV, Batch-I of 2026-27, Block-Sathra, District Poonch (Using Waste Plastics Length 4.500) Length 4.500 Kms