Loading…
Loading…
855 results • Latest
Construction and Maintenance of Road L087-(Link road) Kalimasta to Astangmarg Via High school Gagra Package No. JK19-4214, PMGSY-IV, Batch-I of 2026-27, Block-Gundi Dharam, District Ramban (Using Waste Plastics Length 9.500 Kms) Length 9.500 Kms
Construction and maintenance of road from L027 Dudi Chuntiwari KM 1 RD 100 to LINDUB Waste Plastics Length 2 000 Kms, Stage Complete Carriageway width 3 75Mtrs PMGSYIV Batch I 2026 27 Package No JK084023 PMGSY Division Kupwara
Construction and Maintenance of Road L033-(Link Road) from Hutt to Doun Dedra Package No. JK07-4014, PMGSY-IV, Batch-I of 2026-27, Block-Boond, District Kathua (Using Waste Plastics Length 4.100 Kms) Length 4.100 Kms
Construction and Maintenance of Road L095-(Link road) Rajgarh to Meldan Package No. JK19-4269, PMGSY-IV, Batch-I of 2026-27, Block-Rajgarh, District Ramban (Using Waste Plastics Length 6.500 Kms) Length 6.500 Kms
Construction and maintenance of road from L022 Chamkoote Hajitraah 6km RD 200 to Anawari Length 2 00 Kms Stage Complete Carriageway width 3 75Mtrs PMGSY IV Batch I 2026 27 Package No JK084020 PMGSY Division Kupwara
Construction and Maintenance of Road from L041-Kotli Kalaban Road to Pahal (Link Road) Package No. JK12-4388, PMGSY-IV, Batch-I of 2026-27, Block-Manjakote, District Rajouri (Using Waste Plastics 7.000 Kms) Length 7.000 Kms