Loading…
Loading…
4,789 results • Latest
Preparation of DPR for roads under RIDF-XXXII in the district of Malda.
Battala to Kushadanga More
Construction of CM Model Composite School at Distt Mirzapur
Katakal Bridge to Sripati Sardars House
CONSTRUCATION OF PITCHED FROM KOLBARI TO RAIKHAN AT RAIKHAN SANSAD NO-XVIII MOUZA RAIKHAN KHASBALANDA G.P UNDER HAROA PANCHAYAT SAMITI
Tepul Mirzapur gram panchayat office Damhati FP school
Media Shanimandir to Bastala Via FP school
Tepul Kalbari to Nimtala Desi Maa Tala
Permanent Restoration of road from L032- Hansa to Bhollari, Pkg No. JK07-213, Block Duggan, District - Kathua
Kandu Santra House To Vijay Mandi House within KESHPUR Block in Paschim Medinipur District Length 1.401Km
Construction of road from chaknarayan to barampur pathra chandi mondir under PALSYA G.P. within KHARAGPURII Block in the District of Paschim Medinipur. Length 0.640 Km
Begampur Bokultala to Nihalpur Taki Road
Motal Police Fari PWD road to Mallikpur PWD road Via Piayra Dighir Par
Alanbass to Hochak Road Package NoJK04-227 Length 3.00 Kms. Ukhral Senabati Road upto Gujrara PMGSY III Package No JK19-3004 Length 10.775
Zenihal Chachihal Road Package No JK04198 Length 4.00Km. Banihal Lamber Road Nowgam Lamber Sector Package No JK04 481 Length 4.60 Km. Banihal Chanjlo Road Package No JK04643 Length 3.00 Km Banihal Doligam Road Chainage 4500 to 8500 Package No JK0
2nd call restoration work at choting to udypur lagga MR
UT-07437 Bhaigarh Nala to Chhara MR Stage I and II
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme.-Post 5 Year
UT07438-1 Construction of L072-Amjar to Talla Amjar MR
Permanent Restoration of road L025 Chak Mithiani kote Charwal, (Under SASCI)
Permanent Restoration of road MRL 11-Langar top to Gania, (Under SASCI)
Tisha Sau House to ChandradipunderChanditala-IIBlock
Restoration work at Nandkeshari Gwaldam KM 08 to Deosari MR
Restoration work at Bunga to Kolpuri MR
Construction Work for 40 Type-B Residential Units at Kotwali Jalalpur in District -Ambedkar Nagar
Post 5 Years maintenance work for the road Ambuja 6 No. Pool to Sankrail Station./Abeda Feder Road
Post 5 Years maintenance work for the road Golabari Anandanagar Road
Post 5 Years maintenance work for the road Babun Danga NH to Existing PMGSY Road to Dakshin Joypara via Darmatala
Permanent Restoration of L055- T05 Km 7th To Kailiwala road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05- 169, Block Bhalwal Brahmana, District Jammu.
Permanent restoration of Chuntiwari-Doban road Package No. JK08189
Restoration of Atholi to Pallali, Palali to Machail road on emergency basis during the annual Machail Yatra period w.e.f 15July 2026 to 05 Sept. 2026
Inverter with battery, Hp Desktop all-in-one 13th gen intel core i7-1335U ( 16GB DDR4, 1 TB SSD), Colour Printer Heavy Duty, Steel Almirah, wireless house+ keyboard, SSD (1 TB), USB Extension, Extension Board, Hp Laptop (15.6 Inch FHD 120 Hz, 13th gen intel core i7 -1335U 16 GB DDR4 RAM, 512 SSD)
A4 PAPER RIM, PAPER RIM LEGAL GREN, PAPER RIM A3, XEROX PHASER 3020 TONERBLACK, RICOH MP 2014 AD TONER BLACK, RICOH 1230 D TONER BLACK, BROTHER INK DCP T420W, ESPON INK L380 ALL COLOURS, STICKY NOTE FLAG, LOG BOOK, CALCULATOR BIG SIZE, MONTEX PEN BLUE, MONTEX PEN RED, PILOT PEN BLACK V10, PILOT PEN GREEN V10, PILOT PEN RED V7, PILOT PEN BLUE V7, GLUE STICKS BIG SIZE, HIGHLIGHTER, PERMANENT MARKER, CORRECTION PEN, REGISTER BIG SIZE, SKELTON FILE, FILE COVER SUPERIOR WITH TAG, TAG BIG SIZE, STAPLER SMALL, STAMP PAD, DUMPER, STAPLER PIN BIG SIZE, STAPLER PIN SMALL SIZE, ENVELOPE BIG SIZE, ENVELOPE SMALL SIZE, T-PAPER PINS, HARPIC, PHENHL LIQUID, SOAP, HAND WASH, ODONIL, PHENHYL TABLETS, CLEANING CLOTH, BROOM, TAPE KHAKHI
NIT 19 of 2025-26 permanent restoration work of PMGSY Division Thathri
Construction of L038-Mawani Dawani to Darma Motor Road Stage I and II with 5 Year Maintenance Under PBMC
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme.-Post 5 Year
Preparation of Detail Project Report (DPR) for Construction of Bridge (including Topographical Survey, Hydrographic survey, Preliminary Project Report, Vetting of Waterway, Geotechnical investigation, STA Vetting) under Bankura-II and Chhatna, Block
L050 Dhakwangaon to Gagwari MR Stage-I and II
UT11473-01-L043-Jajal Gaja Devprayag MR Km. 44 to Baman Gaon to Ghantakarn MR, Stage-I and II, Length-6.290 Km.
UT07439-1Construction of L102-Gngarkote to Chhiyori MR Stage-I and II
Slip clearance of Nachani Bansbagar Kota Rd to Raya Bajeta MR Dandadhar Band to Papari MR Thal Munsyari MR Naulda to Khatera
Slip clearance of Tanakpur Tawaghat to ranthi Fultari to Fultari Dhura Rojibunga MR Bageecha to Sinyakhola MR
L053 SAHARFHATAK BHABU SURKHAL MR STAGE I AND II WITH FIVE YEAR MAINTENANCE UNDER PBMC
Restoration work at Tharali to Kimani MR
L030 Pokhar Gaiwali to Pajjgaon Stage-I and II
UT084522, L127- Sirwana to Birma Ki Khol-Bagar(Bagera)-Bhayansoo Motor Road Stage I and II, Length- 5.525km.
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year